BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a four-story above grade municipal facility.

The work to be performed under this project consists of providing all labor, equipment, and materials necessary for the construction/renovation of the JEMB Courthouse 5th Floor Public Restrooms (Men & Women’s), as well as the non-public 2ND, 3RD, 4TH, 5TH floor restrooms. The intent of this project is to modernize the bathrooms. The modernization of the restrooms shall be in accordance with all local codes and regulations, as well as ADA compliance. PHASE I 5th Floor Public Men's and Women's Restrooms Demo electric hand dryers, paper towel dispensers, soap dispensers, mirrors, toilet partitions, baby changing station, feminine hygiene product dispensers, and lights in bathroom. • Remove and reuse grab bars. (Contractor to provide additional grab bars if needed to meet ADA compliance.) Reference Figure 604.5.1 and Figure 604.5.2 in ICC A117.1-2017. • Demo all faucets, lavatories, urinals, and water closets. All water distribution lines for lavatories, water closets and urinals to REMAIN. Replace all cut off valves for water closets, urinals and lavatories. • Demo existing spigot and provide a new tamper-proof spigot. • Demo stainless steel ADA sink with electric plug and light in both men and women’s restroom. Disconnect powerto stainless steel sink, wires to be removed at junction box in the ceiling and capped with wires nuts in junction box. Patch hole with 20-gauge metal studs and cement board and patch with new tile (match size and finish of existing tile, color doesn’t not matter, a coating will be applied to all walls as a part of this project). A new wall mounted ADA sink to be installed in this area. PHASE II Non-Public, 2nd, 3rd, 4th, 5th Floor Non-Public Men’s and Women’s Restrooms Demo electric hand dryers, paper towel dispensers, soap dispensers, mirrors, toilet partitions, toilet paper dispenser, baby changing station, feminine hygiene product dispensers, mirrors, and lights in bathroom. Demo all laminate counter tops. • Remove and reuse grab bars. Any additional grab bars needed the contractor is responsible to provide. • Demo all faucets, lavatories, urinals, and water closets. All water distribution lines for lavatories, water closets and urinals to REMAIN. Replace all cut off valves for water closets, urinals, and lavatories.

Post-Bid

Municipal

$200,000.00

Public - County

Renovation

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
76
Bidding Soon
1,245
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 16, 2023

img_map_placeholder

117 Dick St, East Fayetteville, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.