Site work and paving for a road / highway in Sanford, Maine. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*As of February 20, 2023, a contractor has been awarded. The River Street Reconstruction Project - The project includes 0.73 miles of full depth reconstruction of River Street in Sanford, from High Street to Spartan Drive/Orlando Street. Roadway work includes new pavement, gravels, drainage, slipform concrete curb, fencing, retaining walls, signing, striping and other incidental work. This project also includes lighting and landscaping work along the corridor. The project does not include work at the intersection of River Street and Cottage Street, as noted in the plans. Location: In York County, the project is located on River Street in Sanford, Maine. River Street Pole 1 - replace and move if needed to keep straight line. Pole 2 - replace and move 12' to 15' towards pole 4 to shorten spans and move to keep straight line if needed. Pole 3 - to be eliminated. Pole 4 - replace and to be moved back 12' to 15'. Pole 4H - replace and to be moved back 12' to 15'. Pole 5 - replace and to be moved back 12' to 15'. Pole 6 - replace and to be moved back 12' to 15'. Pole 7 - replace and to be moved back 12' to 15' along with 10' to 15' towards pole 6 (50' pole or 55'). Pole 8 - (new pole 9.1) to be moved back 2' and used as a point pole from pole 9. Pole 9 - move across the street by corner of fence (need to install head guy anchor for CCI) (50' or 55' pole) Pole 10 - move 4' back and 1' toward the intersection so anchor can be installed next to the CCI duct bank. In the field pole 10 River Street & pole 13 Winter Street are the same pole. GIS web shows two (2) different poles but that's not the case. Replace with 50' or 55' pole (Future traffic light poles to be installed by separate project). All questions should be directed to Matthew E. Hill, P.E. at mehill@sanfordmaine.org or in writing to the Department of Public Works. Questions received after 1:00 pm on Tuesday, November 29, 2022 The Contractor shall have the project substantially completed by November 17, 2023; final completion- contract completion date of June 28, 2024.

Award

Roads / Highways

$2,260,000.00

Public - City

Paving, Site Work

99

6

6

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
74
Bidding Soon
1,366
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 6, 2023

img_map_placeholder

River St, Sanford, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.