BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Pasadena, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Pasadena is requesting quote for an emergency guardrail repair at Parkview, West Drive, and Washington in the City of Pasadena. Traffic Control - All traffic control operations shall conform to the provisions of the latest edition of the Manual of Uniform Traffic Control Devices (MUTCD), and the California Supplement to the MUTCD. It is the Contractor's responsibility to provide for public safety and traffic control. The City's Department of Transportation shall review and accept the Contractor's operations and inform the Contractor if an unsafe or hazardous condition is observed. The Contractor must comply with directives for hazard abatement immediately or within the timeframe imposed by the City. In addition to the requirements of MUTCD, the Engineer may require flatter traffic tapers, additional traffic control devices, barricading, and other signing in order to ensure driver awareness and safety in the construction area. Further, the Contractor shall provide Type-II barricades and delineators at locations as determined by the Engineer. The following shall be adhered to for all required signage: . "NO PARKING" signs, if required, shall have the "TOW AWAY" provision, shall cite and comply with the applicable Vehicle Code and Pasadena Municipal Code sections, and shall display the Pasadena Police Department phone number. . The signs shall indicate dates and time durations of the parking prohibition, specific to the location of work, printed clearly in a manner acceptable to the Engineer. . "NO PARKING/TOW AWAY" signs must be posted at least forty-eight (48) hours in advance of the beginning of construction. "NO PARKING/TOW AWAY" signs may not be attached to street trees. "NO PARKING/TOW AWAY" signs may only be attached to street light standards or parking meters with plastic wrap, string, or plastic-coated wire. Tape and other materials that may damage the painted surface of the street light standards and parking meters are not allowed. Parking administration must be notified after signs have been posted twenty-four (24) hours in advance of the beginning of construction. . "NO PARKING/TOW AWAY" signs shall be removed by the Contractor within twenty-four (24) hours after the effective date. New signs shall be posted when changes occur in the parking prohibitions indicated on the previously posted signs All traffic lanes shall have a minimum width of ten feet (10') unless otherwise approved. No traffic lanes shall be closer than five feet (5') from the edge of an excavation, nor closer than two feet (2') from curbs, barricades, or other obstructions. Public transportation stops shall be maintained unless otherwise approved by the Engineer. The Contractor shall contact local transit agencies and coordinate transit route changes and/or stop relocation if transit access cannot be maintained. If the Contractor should fail to provide and install any of the signs or traffic control devices required by these Specifications, the Engineer may cause such signs or traffic control devices to be placed by others and charge the costs therefor against the Contractor and deduct same from progress payments. Where traffic is being permitted to use an uncompleted section of roadway, the condition of said roadway section shall be subject at all times to the approval of the Engineer. When said section is deemed by the Engineer to be unsafe for traffic use, the Contractor may be required to close it to traffic or to take measures to eliminate any unsafe conditions. The Contractor shall maintain continuous access to school drop-off sites, all residential developments, and businesses within the project limits. Any closed access or drive approach shall be immediately restored when the construction operation that necessitated such closure is completed. The Contractor shall maintain local and emergency access at all times. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Roads / Highways

$72,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
103
Bidding Soon
2,224
All Active Projects
974
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.