BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2023 at 7:00 PM

Updated January 27, 2024

Demolition, site work, paving and new construction of a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

As of February 6, 2023, the project has not been awarded. A timeline for award has not been confirmed. No pre bid meeting scheduled. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. A. The work will be done under one prime contract that includes: General Construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract: 1. Demolish and dispose of existing bridge BR01062 2. Demolish and dispose of existing timber retaining walls and stairs 3. Remove existing concrete curb, concrete walk, and bituminous pavement 4. Remove and replace undesirable embankment material (approx. 6,000 CY's) 5. Install concrete block retaining walls (approx. 1,656 SF) 6. Construct spur trail embankments 7. Install H Piling for concrete substructure (approx. 600 LF and two test piles) 8. Construct 2 reinforced concrete abutments (approx. 100 CY's concrete) 9. Furnish and install 200' long weathering steel bowstring truss bridge with concrete deck 10. Install bituminous surface (approx. 3,106 SY's) 11. All associated erosion control, traffic control, utility coordination, and site stabilization. All questions should be submitted no later than November 17, 2022 at 4:00 PM. The State is not obligated to answer questions submitted after the question due date and time

Bid Results

Bridges / Tunnels

$1,972,492.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

53

14

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
141
Bidding Soon
1,565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

December 22, 2022

Project location map

Gateway State Trail, Saint Paul, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.