BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2023 at 7:00 PM

Updated October 25, 2023

Site work for a water / sewer project in Southlake, Texas. Completed plans call for site work for a water / sewer project.

** As of December 20, 2022 , this project has not yet been awarded. A timeline for award has not yet been established.** Questions regarding distribution of Contract Documents and design related questions for this project shall be directed to KSA (attention James McKenzie). Email questions to jmckenzie@ksaeng.com. All questions concerning this project shall be submitted by 5:00 PM on Tuesday, November 29th, 2022. Any questions submitted after this time and date will not be addressed. This conference is for the purpose of interpretation for bidding Contractors of Contract Documents, including plans and specifications, for construction of the project. This project generally consists of: Installation of permanent erosion control and stream stabilization at sites to protect the City of Southlake sanitary sewer facilities. Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within ten (10) days of Notice of Award of the contract. The security must be payable to the City of Southlake in the amount of five percent (5%) of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Contractors for this Project must pay no less than the prevailing wage rates for the area established by the Owner and included in the contract documents. Performance, Payment and Maintenance Bonds, bound to the City of Southlake are required, each in an amount of not less than one hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials. The City of Southlake reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all bids, and/or waive formalities. Bids may not be withdrawn within ninety (90) days from date on which bids are opened. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$205,000.00

Public - City

Site Work

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
174
Bidding Soon
3,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

January 12, 2023

Project location map

1400 Main Street, Southlake, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.