BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Atkinson, Illinois. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Job No. V-92-004-23, I-74 and IL 84 Bridge Bundle, Bridge Rehabilitation, Phase I and II, Henry and Rock Island Counties, Region Two/District Two. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0 The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 8, 2023, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for preparation of two Phase I Project Reports (anticipated to be categorical exclusions) and the preparation of contract plans for two structures. The first project is for bridge rehabilitation of the bridge that carries I-74 under 23rd Ave in Moline. The second project is for the bridge rehabilitation of the bridge that carries IL 84 over the Rock River at the Rock Island Co. Line. The department is aware that several steel beams have been damaged on the 23rd Ave structure that will need to be evaluated and a course of action identified. It will be necessary to have a scour analysis, barrier wall design and a study of the slope wall erosion performed on IL 84 over the Rock River. In addition, lighting, bicycle, and pedestrian accommodations per Complete Streets Policy. Coordination with the public, property owners, and local agencies may be required, along with the creation of needed exhibits and meeting minutes. Phase I may include the preparation of two Project Reports, Traffic Management Analysis (TMA), review and or preparing of Bridge Condition Reports (BCRs), crash analysis, Type, Size and Location (TSL) drawings, cost estimates, pavement design, cross sections, and typical sections, Bi-Monthly coordination meeting and exhibits as well as identifying all design exception, environmental coordination, PESA. Phase II may include the preparation of detailed contract plans and all associated material, TSL drawings, structure plans, roadway plans, typical sections, drainage plans, erosion control plans, cross sections, special details, special provisions; quantities, cost estimates, estimate of time, Maintenance of Traffic (MOT), Traffic Management Plan (TMP), preparing PESA Response. The estimated construction cost for this project is $18,000,000. The completion date for this contract will be 60 months after authorized to proceed. The Phase I portion is expected to be completed in 30 months and the Phase II portion Is expected to be completed in 30 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project. Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The following are the questions that were asked during the WebEx on Friday, October 28, 2022 @ 9:30 AM for IDOT SOI Changes. The method of contractor selection has not been determined at this time. IDOT - 022 - RFQ Engineering - I-74 and IL 84 Bridge Bundle, Bridge Rehabilitation, Phase I and II

Design

Bridges / Tunnels

$18,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
73
Bidding Soon
984
All Active Projects
447
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2023

December 1, 2028

img_map_placeholder

Multiple Locations, Atkinson, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.