BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Rockford, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.

Job No. V-92-004-22, Phase III, Construction Corridor Manager of the Reconstruction and Capacity Expansion of the I-39 Corridor in Rockford and Cherry Valley, Winnebago County, Region Two/District Two. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0 The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 1, 2023, at 10:30 AM at the Region Two/District Two Office in Dixon. Construction Corridor Management services are required for all construction contracts associated with the reconstruction and capacity expansion of I-39 in northern Illinois, south and east of Rockford and in Cherry Valley. The overall construction work may be broken into four or more construction contracts that include the following: Reconstruction of the I-39/US20 interchange, reconstruction and capacity expansion of the I-39 NB and SB ramps from one lane to two lanes at US 20, reconstruction and widening to three lanes plus an auxiliary lane on I-39 from US 20 to Harrison Ave including wider shoulders, addition of concrete median barrier on I-39, reconstruction of 13 bridge structures including the Kishwaukee River Bridge, reconstruction of 44 culverts, reconstruction and additional lanes on US 20/Harrison Ave with three lanes in each direction along Harrison Ave from west of South Mall Drive to E. of Mill Rd, conversion of the I-39/Harrison Ave interchange from a full cloverleaf to a Diverging Diamon Interchange (DDI), removal of the existing cloverleaf ramps at the I-39/Harrison Ave interchange, reconstruction of Mulford Rd, reconstruction of Linden Rd, reconstruction of Perryville Rd, reconstruction of Mall Dr., reconstruction and geometric revisions of Mill Rd, traffic signalization at Harrison Ave and South Mall Dr., Harrison Ave and Mill Rd, and the two DDI intersections at the ramp terminals in the Harrison Ave interchange, reconstruction and relocation of the Cherry Valley Path under the I-39 at Madigan Creek, reconstruction of the existing noise wall SW of Mulford and US 20, construction of a new noise wall along the EB US 20 to SB I-39 ramp, potential construction of new noise wall segments, addition of a Multi-Use Path along the north side of Harrison Ave, improved roadway lighting, new landscaping, new signing, and drainage improvement. The anticipated construction completion date is December 1, 2028. The Consultant must complete and submit final contract records/documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the following categories to be considered for this project. Special Services (Construction Inspection) Highways (Freeways) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The following are the questions that were asked during the WebEx on Friday, October 28, 2022 @ 9:30 AM for IDOT SOI Changes. The method of contractor selection has not been determined at this time. IDOT - 024 - RFQ Engineering - Phase III, Construction Corridor Manager of the Reconstruction and Capacity Expansion of the I-39 Corridor

Design

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
243
Bidding Soon
3,887
All Active Projects
1,531
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2023

December 1, 2028

img_map_placeholder

I-39, Rockford, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.