BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Grayville, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Job No. C-99-022-23, I-64 Over Wabash River Bridge Replacement Project, Phase III Construction Engineering, White County, Region Five/District Nine. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 2, 2023, at 10:00 AM at the Region Five/District Eight Office in Collinsville. Phase III engineering services are required for construction inspection, supervision, construction layout, material testing, review of construction documents, and record maintenance. This work is anticipated to consist of the construction of two new structures to carry I-64 over the Wabash River. The work includes maintenance of the existing bridge until demolition, drilled shafts, steel girders with concrete decks, concrete pavement, earth excavation and embankment, maintenance of traffic, and assistance in public/project coordination. The department will provide a Resident Engineer to direct the Contractor and to complete pay estimates and change orders. The Resident Engineer will direct/coordinate the activities of the Consultant staff. The Consultant will be required to furnish a liaison Resident Engineer to work directly with the IDOT Resident Engineer and provide staff to perform the engineering services required for this project or provide staff to supplement the department's staff. The Consultant's workforce shall be adequate to allow completion of this project in a timely manner and in accordance with the department's Standard Specifications for Road and Bridge Construction. The Consultant may be required to furnish all the construction supervision, engineering layout, on-site inspection, materials testing, maintenance of records and documentation, and perform other duties as directed by the engineer. Sampling, testing, and acceptance of construction materials shall be per department policies, Manual of Materials Inspection, Manual of Test Procedures for Materials, Project Procedures Guide, Highway Standards, and individual construction contract plans and special provisions. The Consultants will maintain records and submit documentation of Quality Assurance and material acceptance activities required by the construction contract, department policies, and as directed by the department's supervising Materials personnel. The Prime firm must be prequalified in Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The following are the questions that were asked during the WebEx on Friday, October 28, 2022 @ 9:30 AM for IDOT SOI Changes. The method of contractor selection has not been determined at this time. IDOT - 050 - RFQ Engineering - I-64 Over Wabash River Bridge Replacement Project, Phase III Construction Engineering, White County, Region Five/District Nine

Design

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
16
Bidding Soon
337
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

I-64, Grayville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.