BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a playground / park / athletic field.

*As of February 2, 2023, a contractor has been awarded. A general description of the primary work elements is listed below for reference. Contractor is responsible for reviewing all the drawings and specifications to obtain a complete understanding of the entire work scope. This contract includes all work indicated on the project documents, including but not limited to: 1. Mobilization and establishment of site perimeter fencing and maintenance and protection of existing conditions. 2. General demolition and removals of partitions, finishes, accessories, and fixtures within the aquatics locker rooms, showers, and restrooms and staff areas. 3. General demolition and removals of damaged exterior tiles at West Stair Tower. 4. Provide and install temporary restroom trailers and necessary electrical and plumbing accessories during construction. 5. Provide and install temporary rinse showers on pool deck and necessary plumbing accessories during construction. 6. Provide and install temporary changing tents and staff tents during construction. 7. Reconfiguration of the aquatics locker rooms and restrooms to include new gender-neutral locker room, new multipurpose room, and reconfigured staff area. 8. Rehabilitation of the existing lobby, locker rooms, and staff areas to include new accessories, fixtures, finishes, wall partitions and equipment. 9. Provide and install new finishes and fixtures within the limits of architectural scope of work. 10. Provide and install new light fixtures, public address system, smoke detectors, power & data within the limits of electrical scope of work. 11. Provide and install new sprinklers within the limits of plumbing and fire protection scope of work. 12. Provide and install new HVAC diffusers and ductwork within the limits of mechanical scope of work. 13. Provide and install new windows in the lobby and install exterior tile patch around window. 14. Provide and install exterior patch at West Stair Tower within the limits of architectural and structural scope of work. 15. Provide all necessary permits. 16. Closeout documents including warranties. RFI Due Date 22 November 2022 Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYScertified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,473,245 or less (maximum amount has been adjusted for inflation effective January 1, 2022). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. The completion date for this project is 270 calendar days after agreement has been approved by the NYS Comptroller's Office. In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: Maxfield Schnaufer Email: Maxfield.Schnaufer@parks.ny. gov / Phone: 212-866-2694 Syed Shaukat Email: Syed.Shaukat@parks.ny.gov / Phone: 212-866-3554 The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. By submitting a bid, the Bidder agrees not to make any claim for, or have any right to, damages because of any misinterpretation or misunderstanding of the specifications, or because of any misinformation or lack of information. OPRHP reserves the right to exercise the following: Change any of the scheduled dates herein; Amend IFB requirement(s) after their release to correct errors or oversights, or to supply additional information as it becomes available; Withdraw the IFB, at its sole discretion without any obligation or liability to any vendor; Eliminate any mandatory, non-material requirement that cannot be complied with by all of the prospective Bidders; Evaluate, accept and/or reject any and all bids, in whole or in part, and to waive technicalities, irregularities, and omissions if, in OPRHP's judgement, the best interests of OPRHP will be served. In the event compliant bids are not received, OPRHP reserves the right to consider late or non-conforming bids as offers; Require the Bidder to demonstrate, to the satisfaction of OPRHP, any information presented as part of their proposal; Require clarification at any time during the procurement process and/or require correction of arithmetic or other apparent errors for the purpose of assuring a full and complete understanding of a Bidder's proposal and/or to determine an Bidder's compliance with the requirements of this solicitation; Disqualify any Bidder whose conduct and/or bid fails to conform to the requirements of the solicitation; Use proposal information obtained through OPRHP investigation of a Bidder's qualifications, experience, ability or financial standing, and any material or information submitted by the Bidder in response to OPRHP's request for clarifying information in the course of evaluation and selection under this IFB; Prior to the award, determine a tie breaking mechanism for award of the Contract to serve the best interests of OPRHP and the State of New York; Negotiate with the successful Bidder within the scope of the IFB to serve the best interests of OPRHP and the State of New York; Conduct Contract negotiations with the next ranked responsible Bidder, should OPRHP be unsuccessful in negotiating an Agreement with the selected Bidders; Move to the next ranked responsible low Bidder should the low bidder fail to implement the requirements of the bid; If OPRHP terminates the Contract for non-performance, OPRHP reserves the right, with the approval of the New York State Office of the Attorney General and the Office of the State Comptroller, to award a contract to the next highest ranked Bidder of the original bid submission within the first twelve months of the award; Utilize any and all ideas submitted in the bids received; Make an award under the IFB in whole or in part; and Seek revisions of bids. Bids containing false or misleading statements, or which provide project contacts that do not support an attribute or condition claimed by a Bidder, may be disqualified from consideration. If, in the opinion of OPRHP, a statement is intended to mislead OPRHP in its evaluation of the bid, and the attribute, condition, or capability is a requirement of the IFB, the bid shall be disqualified from consideration. Response to Bidder Questions and Requests for Clarification OPRHP will provide a written response to all substantive questions and requests for clarification. Tie Bids In the event there is a tie final determination will be made by the OPRHP Deputy Commissioner for Capital. Modification or Withdrawal of Bids Bid modifications that are submitted in writing and signed by an authorized representative of the bidding firm will be considered for award if received by OPRHP prior to the scheduled proposal due date. Bids may be withdrawn or cancelled prior to the scheduled proposal due date. A bid may be rejected by OPRHP: if it shows any alteration of terms, conditions, or requirements; for any other irregularities; if it is incomplete, or if it offers an alternate bid not invited by the specifications. Freedom of Information Law Your bid to OPRHP, including accompanying documents, is subject to the Freedom of Information Law (FOIL) found in Article 6 of the N.Y. Public Officer Law. FOIL provides that certain records are exempt from disclosure, including those that contain (1) trade secrets, (2) information that, if disclosed, would cause substantial injury to the competitive position of your organization, or (3) critical infrastructure information. Records may be redacted to protect only the portions of documents that fall within a FOIL exemption. An entire document may not be withheld if only a portion of the document is exempt from disclosure. Blanket assertions that information is a trade secret, confidential, or proprietary are insufficient to justify withholding information under FOIL. If you identify information seeking an exemption from public disclosure due to the above-mentioned reasons such request will be reviewed, and a determination will be made as to whether the information is exempt from disclosure under FOIL. However, such submissions seeking non-disclosure will not be considered unless it is accompanied with an explanation justifying the privilege. The State's determination may be appealed pursuant to POL 89(5)(c). Pursuant to POL 87(2)(b), the State, without having to request it, will redact information that "if disclosed would constitute an unwarranted invasion of personal privacy." Timely Submission The Bidders are solely responsible for timely delivery of their bid to the location set forth by the stated bid due date/time and are solely responsible for delays in receipt, including but not limited to those due to third-party carriers. Bidder Proposal Clarification Prior to award, OPRHP reserves the right to seek clarifications, request proposal revisions, or to request any information deemed necessary for proper evaluation of proposals from all Bidders deemed to be eligible for Contract award. Failure of a bidder to cooperate with OPRHP's effort to clarify a proposal may result in the proposal being labeled as non-responsive and be given no further consideration. Additionally, OPRHP reserves the right to use information submitted by the Bidder in response to OPRHP's request for clarifying information in the course of evaluation and selection under this IFB. Bid Review and Contract Approval The Contract resulting from this IFB will not be effective until approved by the Office of the Attorney General and the Office of the State Comptroller. Debriefing Sessions A debriefing is available to any entity that submitted a proposal or bid in response to a solicitation ("Bidder"). A Bidder will be accorded fair and equal treatment with respect to its opportunity for debriefing. Debriefing must be requested in writing by any bidder within fifteen (15) calendar days of OPRHP notifying the unsuccessful bidders that another vendor was selected. A bidder's written request for a debriefing must be submitted to the designated contact listed on the cover of this IFB. The debriefing will be scheduled within ten (10) business days of receipt of written request by OPRHP or as soon after that time as practicable under the circumstances. Bid Protest Procedure OPRHP procedures for handling protests of bid awards are set forth in the Bid Protest Procedures which can be found at the end of this document. Indemnification The Contractor agrees to indemnify, defend, save, and hold harmless the State of New York, OPRHP, and their officers, employees, and agents of and from any claims, demands, actions, or causes of action of any kind arising out of the services of the Contractor provided for in this agreement. Solicitation This IFB is a solicitation to bid, not an offer of a contract. It is the policy of the Office of Parks, Recreation and Historic Preservation (OPRHP) to provide bidders with an opportunity to administratively resolve disputes or inquiries related to OPRHP contract awards. Bidders are encouraged to seek resolution of disputes through consultation with the Designated Contact(s). After being notified of the results of this contract opportunity, any entity or individual that participated in the procurement may submit a protest of the resulting contract award. OPRHP reserves the right to suspend, modify, or cancel this procurement at any time during the procurement process. OPRHP also reserves the right to waive or extend the deadlines in this procedure. Submission of Formal Written Protests Protests must be received by the Designated Contact no later than five (5) business days after a debriefing or ten (10) business days after the written notice of selection or non-selection for contract Protests must be submitted in writing, clearly marked as a protest on the envelope or in the email subject line, and include the following information: 1. Solicitation or contract number 2. Name, address, email address and telephone number of the filer 3. Detailed statement of the legal and factual grounds for the protest 4. Statement of the relief requested 5. Copies of relevant documents Agency Response Within 30 business days of receipt of a protest, OPRHP's protest officer (the Director of Audit or her designee) will respond with a protest determination stating the agency's decision on the protest and the reasoning on which it is based. In making a determination, the protest officer will consider the legal and factual grounds stated in the protest, consult with the Designated Contact and appropriate program staff, and review all relevant documents. Finality; Appeal For contract opportunities subject to the approval of the Office of the State Comptroller, the protesting party may appeal OPRHP's protest determination to the Office of the State Comptroller in accordance with the regulations contained in Part 24 of Title 2 of the New York Codes, Rules and Regulations. For contract opportunities that are not subject to the approval of the Office of the State Comptroller, OPRHP's protest determination is the conclusive and final determination of the protest. Nothing in these bid protest procedures is intended to limit or impair the rights of any bidder to seek and pursue remedies of law through the judicial process. Provide and install new HVAC diffusors and ductwork within the limits of work. Estimate Range: $700,000.00 - $1,000,000.00 D006053 $42,704.00 Forty Two Thousand Seven Hundred and Four and 00/100 Dollars *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Swimming Pools

$932,750.00

Public - State/Provincial

Renovation

139

24

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
236
Bidding Soon
4,614
All Active Projects
2,117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2022

January 9, 2023

img_map_placeholder

679 Riverside Dr, New York, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.