BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Joliet, Illinois. Contact the soliciting agency for additional information.

Job No. C-91-117-22, I-80 at Wheeler and at River Rd, Phase III Project, Will County, Region One/District One. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 9, 2023 at 9:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the improvement of I-80 at Wheeler and at River Rd. Work includes, but is not limited to, a full replacement of S.N. 099-0175 (Wheeler Rd), installation of fence railing, drainage installation, pavement reconstruction, sidewalk construction, ADA ramp construction, guardrail replacement, detouring of traffic to the north and south of the structure. The proposed bridge S.N. 099-8324, will accommodate 11' lanes, 5' shoulder, and a 5' sidewalk in each direction with a 12' turn lane. River Road Bridge improvements, consists of full replacement of S.N. 099-0177 and installation of protective shielding, as well as pavement reconstruction, shoulder construction, guardrail replacement, and detour of traffic control along the roadway to the north and south of the structure, and any other work necessary to complete the project as shown on the plans. The proposed bridge will accommodate 11' lanes, 4' shoulder in each direction and 10' multi-use path on the east side of River Road. Any and all incidental and collateral work necessary to complete the improvement. The following structures may be included: o S.N. 099-0175 (Existing Structure): The structure is located on Wheeler Road over I-80 5.4 miles east of I-55 o S.N. 099-8324 (Existing Structure): The structure is located on River Road over I-80 1.0 mile west of I-55 o S.N. 009-0177 (Existing Structure): The structure is located on River Road The anticipated construction completion date is October 31, 2024 plus 10 working days. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The following are the questions that were asked during the WebEx on Friday, October 28, 2022 @ 9:30 AM for IDOT SOI Changes. The method of contractor selection has not been determined at this time. IDOT - 001 - RFQ - I-80 at Wheeler and at River Rd, Phase III Project, Will County, Region One / District One

Design

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
126
Bidding Soon
1,740
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

Multiple Locations, Joliet, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.