BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Freeport, Illinois. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Job No. C-96-004-23, US 67 & IL 100 (Beardstown Bridge) over the Illinois River, Phase III Services, Cass and Schuyler Counties, Region Four/District Six. This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 23, 2023, at 10:00 AM, at the Region Four/District Six Office in Springfield. Phase III engineering services are required for the construction of the Beardstown Bridge over the Illinois River on US 67 / IL 100 in Cass and Schuyler Counties. Work involved includes the construction of a new bridge crossing the Illinois River on a new alignment. In addition to bridge construction, other work items involved include earthwork, HMA and concrete pavement, drainage structures, lighting and other miscellaneous items. The anticipated construction completion date is the December 1, 2026. The Consultant must complete and submit final measurements, calculations, and final contract records to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The following are the questions that were asked during the WebEx on Friday, October 28, 2022 @ 9:30 AM for IDOT SOI Changes. The method of contractor selection has not been determined at this time. IDOT - 039 - RFQ Engineering - US 67 & IL 100 (Beardstown Bridge) over the Illinois River, Phase III Services, Cass and Schuyler Counties, Region Four/District Six

Design

Bridges / Tunnels

$300,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
92
Bidding Soon
1,961
All Active Projects
715
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2023

December 1, 2026

img_map_placeholder

US-20, Freeport, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.