BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Half Moon, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

**Per owner agency "We have cancelled that bid and are splitting the scope of work into two separate bids"** Catawba County (Hereinafter "County") is Requesting Bids From Qualified Contractor(S) to Provide Repairs and Alternations to Shadowfax Wynd Road and Windemere Lane Located Within the Deerfield Subdivision in Catawba County. Project Summary for Shadowfax Wynd Road: Shadowfax Wynd is a Road Located Within the Deerfield Subdivision, Off of Willowbottom Road, in Hickory Nc That Consists of Approximately 25 Homes or Lots. The Roads in the Subdivision Were Constructed in or About 2000 and Have Been Privately Maintained. The Subdivision Residents Have Petitioned the County to Finance Road Repairs to Bring the Neighborhood Roads Up to North Carolina Department of Transportation (Ncdot) Standards With the Goal That the Roads Will Be Accepted Into Ncdot's Secondary Road Maintenance Program. The Roads Are in Poor Condition and Need Repairs Throughout. The Main Access Road Into the Subdivision is Shadowfax Wynd and It is Approximately 2,942 Feet Long. The Majority of the Subdivision Roads Surface Will Require Milling 1.5 Inches Down and Overlaying 1.5 Inches of Asphalt (Design Mix S9.5c). Some Sections Will Have to Be Milled 2 Inches and the Gravel Base Will Have to Be Reconditioned, Where Wheel Ruts and Pot Holes Will Be Filled With Gravel (Type Abc) and the Entire Base Will Be Compacted and Must Pass a Proof Roll Before Being Overlaid With 1.5 Inches of Asphalt (Design Mix S9.5c). One Section of Shadowfax Wynd Will Need to Be Milled and the Remaining Asphalt and Base Cut and Removed Down 9 1/2 Inches Below Existing Grade. The Subgrade Will Be Compacted and Ncdot Nonwoven Geotextile Type 4 Installed Below 8 Inches of Compacted Abc Gravel Base. The Gravel Base Will Have to Pass a Proof Roll Before It is Topped With 1.5 Inches of Asphalt (Design Mix S9.5c). Near the Cross Drain at the End, the Pavement Will Need to Be Raised an Inch to Meet Willowbottom Road. The Contractor Will Be Responsible for Providing All Tools, Equipment and Materials to Complete the Work. Proper Traffic Control Measures and Signage Will Be Necessary to Control Access. Access to All Houses and Active Construction Sites Will Be Maintained Throughout the Duration of the Project. The Contractor Will Be Responsible for Having the Gravel Density Tests Performed by a Qualified and Certified Testing Firm and for Coordinating With County Staff to Witness Proof Rolls. The Contractor is Also Responsible for Pulling Asphalt Cores Every 1,000 Feet of Travel Lane and Tested Per Ncdot Specifications as Presented in Ncdot Quality Control Manual (Ncdot Qms Manual Section 10) Drainage Improvements: the Drainage System Associated With Shadowfax Wynd Subdivision Road Will Also Have to Be Modified to Meet Ncdot Standards. There is a Large Pipe for a Creek Crossing That Will Need to Be Replaced Along With the Associated Headwalls and Pavement Above It. The Current Pipe is Approximately 55 Feet Long and is a 60-inch Diameter Corrugated Metal Pipe. The Single Pipe Will Have to Be Replaced by Either Two (2) 60-inch Diameter Pipes (the Pipes Must Be Made of Ncdot Approved Materials), or One (1) 95-inch by 67-inch Corrugated Metal Pipe Arch (or Other Ncdot Approved Material). Dimensions of the Headwall at the Upstream Side is 12 Feet Deep for a Length of 12 Feet in the Middle and 8 Feet to Either Side the Depth is 5 Feet. On the Downstream Side, Depth is 14.5 Feet for a Length of 12 Feet, 7 Feet Further on Either Side the Depth is 7 Feet and 7 More Feet Brings Depth to 6 Feet. The Head and Tail Walls for the Creek Crossing Must Be Constructed in Accordance With Ncdot Approved Materials and Design Details as Presented in Ncdot Standard Drawing 300.01. There is a Pipe at the 1314 Address That Will Need to Be Cleaned. The Shoulder at 18+55 Through 19+83 Will Need to Be Graded 6 Feet Towards the Woods to Allow Proper Draining Where Water Has Been Collecting on the Road. Submit Written Questions Contractor November 21, 2022 at 5:00 Pm Provide Responses to Questions County November 23, 2022 at 5:00 Pm Written Questions Shall Be Emailed to Tinawright@catawbacountync.gov Catawba County Reserves the Right to Reject Any and All Bid Responses and to Waive Informalities as May Be Permitted by Law.

Project Abandoned

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

3

4

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
28
Bidding Soon
523
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

July 3, 2023

img_map_placeholder

Multiple Locations, Half Moon, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.