Site work for a water / sewer project in Kiln, Mississippi. Completed plans call for site work for a water / sewer project.

The project includes removal of existing culverts, installation of 31x51 arch pipe culverts, site grading and excavation, loose and grouted riprap bank stabilization, erosion control measures, and gravel road restoration. All questions pertaining to clarification of the bidding documents shall be directed in writing to Jim Maclellan, P.E. at jim@overstreeteng.com. Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by the Bid Security (as defined in Section 00100 Instructions to Bidders) in the amount of not less than five percent (5%) of the Bid. The Bid Bond may be from a surety acceptable to the Owner satisfying the requirements specified in the Contract Documents or Certified Check upon a national (legally recognized to conduct business in the State of Mississippi) or state bank, payable without recourse to the Hancock County Board of Supervisors as a guarantee that the Bidder will within fifteen (15) days after the Notice of Award enter into a Contract. The Successful Bidder must furnish a Performance Bond and a Payment Bond equal to 100% of the Contract amount each with a surety company acceptable to the OWNER and in a form acceptable to the OWNER. Bids may be modified or withdrawn at any time prior to the time set for opening Bids. Bidders may not withdraw their Bids for a period of ninety (90) calendar days after the actual date of the opening of the Bids. Complete instructions for filing Bids are included in the Instructions to Bidders. The Owner reserves the right after opening Bids to reject any or all Bids, to waive any informality (non-responsiveness) in a Bid, or to make award to the lowest and best qualified, responsive, and responsible Bidder and reject all other Bids, as it may best serve the interest of the OWNER. CONTRACT COMPLETION TIME The number of consecutive calendar days within which the work is to be completed is 90 calendar days, as set forth in Section 00520. LIQUIDATED DAMAGES Provisions for liquidated damages are set forth in Section 00520. The amount of liquidated damages due to Owner shall be $250.00 per day assessed for each day beyond the agreed contract completion date.

Award

Water / Sewer

$130,756.00

Public - County

Site Work

9

14

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
441
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

January 19, 2023

img_map_placeholder

Lawrence Ladner Rd, Kiln, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lawrence Ladner Road Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.