BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kiln, Mississippi. Completed plans call for site work for a water / sewer project.

The project includes removal of existing culverts, installation of 31x51 arch pipe culverts, site grading and excavation, loose and grouted riprap bank stabilization, erosion control measures, and gravel road restoration. All questions pertaining to clarification of the bidding documents shall be directed in writing to Jim Maclellan, P.E. at jim@overstreeteng.com. Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by the Bid Security (as defined in Section 00100 Instructions to Bidders) in the amount of not less than five percent (5%) of the Bid. The Bid Bond may be from a surety acceptable to the Owner satisfying the requirements specified in the Contract Documents or Certified Check upon a national (legally recognized to conduct business in the State of Mississippi) or state bank, payable without recourse to the Hancock County Board of Supervisors as a guarantee that the Bidder will within fifteen (15) days after the Notice of Award enter into a Contract. The Successful Bidder must furnish a Performance Bond and a Payment Bond equal to 100% of the Contract amount each with a surety company acceptable to the OWNER and in a form acceptable to the OWNER. Bids may be modified or withdrawn at any time prior to the time set for opening Bids. Bidders may not withdraw their Bids for a period of ninety (90) calendar days after the actual date of the opening of the Bids. Complete instructions for filing Bids are included in the Instructions to Bidders. The Owner reserves the right after opening Bids to reject any or all Bids, to waive any informality (non-responsiveness) in a Bid, or to make award to the lowest and best qualified, responsive, and responsible Bidder and reject all other Bids, as it may best serve the interest of the OWNER. CONTRACT COMPLETION TIME The number of consecutive calendar days within which the work is to be completed is 90 calendar days, as set forth in Section 00520. LIQUIDATED DAMAGES Provisions for liquidated damages are set forth in Section 00520. The amount of liquidated damages due to Owner shall be $250.00 per day assessed for each day beyond the agreed contract completion date.

Award

Water / Sewer

$130,756.00

Public - County

Site Work

9

14

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
95
Bidding Soon
1,032
All Active Projects
513
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 19, 2022

January 19, 2023

April 19, 2023

img_map_placeholder

Lawrence Ladner Rd, Kiln, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.