Published January 26, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Columbus, Ohio. Completed plans call for the renovation of a municipal facility.

Work for which consists of replacing the compost blowers, one biofilter fan, two leachate pumps, locker rooms renovations, improvements to the electrical system, minor improvements to the composting process, and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, special provisions, and City of Columbus Construction and Material specifications set forth in this Invitation For Bid (IFB). Questions pertaining to the drawings and specifications must be submitted in writing only to the [Hatch Associates Consultants Inc.], ATTN: [Hasan Alkhayri], via email at hasan.alkhayri@hatch.com prior to 12/7/2022 12:00 PM local time. Any questions regarding the bidding process may be sent electronically to DPUConstructionBids@columbus.gov. No phone calls will be accepted. All work shall be substantially complete within [670] calendar days of the Notice to Proceed, with final completion to occur within [730] calendar days. The City anticipates issuing a Notice to proceed on or about [May 2023]. The City may cancel the IFB, reject any or all bids in whole or in part, waive technicalities, and/or advertise for new bids, without liability to the City and when in the best interest of the City up until the time the contract is executed by the City. The City shall have 180 calendar days from the date of the bid opening to provide the bidder a Notice of Intent to Award. During this 180 day period, the bidder agrees to hold their bid prices. MBE/WBE GOAL FOR THIS CONTRACT: 25%

Bid Results

Municipal

$10,996,080.00

Public - City

Renovation

93

37

10

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Fabricator Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Existing Products, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Wood Trim, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roof and Wall Specialties and Accessories, Roof Accessories, Relief Vents, Fire and Smoke Protection, Applied Fireproofing, Joint Protection, Preformed Joint Seals, Joint Gaskets, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Postal Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Art, Casework, Countertops, Furniture, Seating, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Fuel-Fired Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
58
Bidding Soon
1,181
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

February 17, 2023

img_map_placeholder

7000 Jackson Pike, Columbus, OH

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Compost Facility Odor Control Improvements Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.