EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a road / highway in Albany, New York. Working plans call for site work for a road / highway.

Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $1,296,500 for C, $52,200 for P, and $27,100 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $50,000,000 and $60,000,000 for C, between $1,000,000 and $2,000,000 for P, and between $500,000 and $1,000,000 for E. Pursuant to State Finance Law 139-j and 139-k, this solicitation includes and imposes certain restrictions on communications between OGS D&C and a bidder during the procurement process. A bidder is restricted from making contacts from the earliest posting on the OGS website, in a newspaper of general circulation, or in the Contract Reporter, of written notice, advertisement or solicitation of offers, through final award and approval of the contract by OGS D&C and the Office of the State Comptroller ("Restricted Period") to other than designated staff, unless it is a contact that is included among certain statutory exceptions set forth in State Finance Law 139-j(3)(a). Designated staff are Jessica Cook, Jessica Hoffman, and Pierre Alric in the Division of Contract Management, telephone (518) 474-0203, fax (518) 473-7862. OGS D&C employees are also required to obtain certain information when contacted during the restricted period and to make a determination of the responsibility of the bidder pursuant to these two statutes. Certain findings of non-responsibility can result in rejection for contract award and in the event of two findings within a four-year period, the bidder is debarred from obtaining governmental Procurement Contracts. Bidders responding to this Advertisement must familiarize themselves with the State Finance Law requirements and will be expected to affirm that they understand and agree to comply on the bid form. Further information about these requirements can be found within the project manual Pursuant to Public Buildings Law 8(6), effective January 11, 2020, for any projects where the project design commenced on or after January 1, 2020 and for any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,400,000 or less, as adjusted annually for inflation beginning January 1, 2020. If more than one responsible and reliable MWBE firm meets these requirements, the MWBE firm with the lowest bid will be deemed the apparent low bidder. XX Project commenced design before January 1, 2020. Not subject to provision. ___ Project commenced design on or after January 1, 2020. Subject to provision. The substantial completion date for this project is 1,212 days after the Agreement is approved by the Comptroller. Note that parking restrictions and security provisions will apply, and all vehicles will be subject to search. Refer to Document 002218 for any additional requirements for attendance at the pre-bid site visit. Phone the office of Michael McLaughlin (518-408-1457) a minimum of 48 hours in advance of the date to provide the names of those who will attend the pre-bid site visit. Only contractors that schedule a visit at least 48 hours in advance will be allowed to participate in the pre-bid site visit. Pursuant to New York State Executive Law Article 15-A and the rules and regulations promulgated thereunder, OGS is required to promote opportunities for the maximum feasible participation of New York State-certified Minority and Women-owned Business Enterprises ("MWBEs") and the employment of minority group members and women in the performance of OGS contracts. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Construction Work and Plumbing Work and an overall goal of 10% for MWBE participation, 5% for Minority-Owned Business Enterprises ("MBE") participation and 5% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Electrical Work. The total contract goal can be obtained by utilizing any combination of MBE and /or WBE participation for subcontracting and supplies acquired under this Contract. Trades with 0% goals are encouraged to make "good faith efforts" to promote and assist in the participation of MWBEs on the Contract for the provision of services and materials. Article 17-B of the New York State Executive Law provides for more meaningful participation in public procurement by certified Service-Disabled Veteran-Owned Businesses ("SDVOBs"). Bidders are expected to consider SDVOBs in the fulfillment of the requirements of the Contract. Such participation may be as subcontractors or suppliers, as proteges, or in other partnering or supporting roles. OGS hereby establishes overall goals for SDVOBs' participation under this contract as follows: 6% for the C trade contractor, 3% for the E trade contractor, and 3% for the P trade contractor, based on the current availability of qualified SDVOBs. Trades with 0% goals are encouraged to make "good faith efforts" to promote and assist in the participation of SDVOBs on the Contract for the provision of services and materials. The Office of General Services reserves the right to reject any or all bids. MBE Goals C Trade: 15% E Trade: 5% P Trade: 15% WBE Goals C Trade: 15% E Trade: 5% P Trade: 15% SDVOB Goals C Trade: 6% E Trade: 3% P Trade: 3% All bids rejected and project will be rebid for work to be announced at a later date

Final Planning

Roads / Highways

$409,400.00

Public - State/Provincial

Site Work

131

52

29

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Architectural Woodwork, Wood Stairs and Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Metal Lath, Gypsum Plastering, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Access Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Fabricated Control Booths
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Unit Paving, Site Improvements, Screening Devices, Planting, Turf and Grasses, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
151
Bidding Soon
1,661
All Active Projects
748
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2022

August 21, 2023

img_map_placeholder

Multiple Locations, Albany, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace ESP Brick Roadways System and Associated Construction Components - Electrical Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.