BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Fairburn, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and road / highway.

As of August 3, 2023, construction is underway and nearing completion, however, an exact timeline for construction has not been confirmed. The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete the GoLightly Street Pedestrian Improvements Project. The work includes the installation of new sidewalk, driveway aprons, and ADA ramps on both sides of Golightly Street in the City of Fairburn. The contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt and concrete, as well as clean up and backfilling. The scope of Add Alternate #1 consists of the installation pedestrian lighting within the project limits. Add Alternate #2 consists of the removal of the existing roll back curb & gutter and replacing it with new standard 24" curb & gutter. Add Alternate #3 includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, striping, manhole adjustments and other associated tasks. The scope of Add Alternate #4 includes the installation of 24" curb & gutter, 4' sidewalk, and open back catch basins on the east side of W. Campbellton Street, between Golightly Street and Dodd Street. All work must be completed within one hundred and fifty (150) calendar days of the Notice to Proceed with Construction (NTP). Questions of a technical nature should be submitted in writing to the City of Fairburn via electronic mail, to the procurement inbox: procurement@fairburn.com. Installation of a Concrete Sidewalk With a Beauty Strip on Both Sides of the Golightly Street, Along With Pedestrian Lighting. Golightly Street, From Dodd Street to W. Campbellton, Shall Be Striped for a Bicycle Lane. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Roads / Highways

$498,410.00

Public - City

Outdoor Lighting, Paving, Site Work

24

8

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
150
Bidding Soon
2,280
All Active Projects
1,097
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 14, 2022

January 13, 2023

June 12, 2023

img_map_placeholder

Golightly St, Fairburn, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.