Published January 31, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Boulder Creek, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project generally consists of providing new water mains and water services with associated fittings, valves and hydrants, and abandoning two existing water mains in-place, as shown on the project plans and detailed in the technical specifications. Provide 12,000 LF of ductile iron pipe water main, 12-inch and smaller, 125 LF of steel water main installed on an existing bridge, 3 pressure reducing valve stations, 7 fire hydrants and 77 water services. Provide traffic control during the work and repaving of the streets. Bidders are expected to be familiar with the work areas prior to bidding; Bidders are encouraged to tour the project work areas prior to attending the pre-bid. The contract time is hereby established as 365 calendar days. The contract time shall be consecutive calendar days from the date of receipt of the Notice to Proceed. Time extensions will be granted for material delivery delays outside the Contractors control. The Bidder to whom the award is made will be required to submit a payment bond and a performance bond, each in a principal amount not less than one hundred percent (100%) of the total Contract Price. Bid security or a bid guaranty bond, in an amount not less than ten percent (10%) of the Total Bid amount, is required to be submitted with the Bid. The successful Bidder shall execute the Contract Agreement within ten (10) workdays after the date of the Notice of Award. The successful Bidder shall furnish insurance in accordance with the Contract Documents before execution of the Contract Agreement. The required insurance includes, but is not limited to, Contractors Installation All Risk Insurance covering the value of the Work and all materials and equipment to be incorporated therein while at the site and during inland transit insuring the replacement value, subject to a deductible not to exceed $5,000 for any single loss. This insurance shall also contain an insurers waiver of subrogation against SLVWD, and it shall specifically cover losses due to earthquake and flooding. SLVWD may withhold issuance of the Notice to Proceed for a period not to exceed sixty (60) calendar days after the date the Contract Agreement is executed. In accordance with Section 22300 of the State of California Public Contract Code, the Contractor, at his request and expense, will be permitted to substitute equivalent securities for any monies withheld to ensure performance. Upon satisfactory completion of the Contract, the Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from SLVWD, pursuant to the terms of Section 22300. Refer to applicable portions of the Escrow Agreement (Section 00630) for Security Deposits in Lieu of Performance Retention included with the Contract Documents. The Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. Pursuant to Sections 1770 et seq. of the State of California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations. SLVWD has obtained the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the contract from the Director of the Department of Industrial Relations. These rates are on file at SLVWD located at 13060 CA-9, Boulder Creek, California, 95006 or may be obtained from the State of California, Division of Labor Statistics and Research at (415) 557-0561. Copies may be obtained on request. A copy of these rates shall be posted at the job site. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. SLVWD reserves the right to reject any and all bids. Question Deadline: 12/19/2022 at 5:00 PM PT Requests for interpretation of the Contract Documents shall be submitted to Josh Wolff at SLVWD in writing to jwolff@slvwd.com. SLVWD will release a final response to requests for interpretation no later than December 21, 2022.

Bid Results

Water / Sewer

$6,233,100.00

Public - County

Paving, Site Work

35

20

17

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds, Multiple Seating, Multiple-Use Fixed Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Facility Water Distribution Piping, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Valves
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
93
Bidding Soon
1,526
All Active Projects
677
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

March 27, 2023

img_map_placeholder

Multiple Locations, Boulder Creek, CA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Lyon and Big Steel Zone Pipeline Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.