BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Fargo, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; for outdoor lighting for a road / highway; and sidewalk / parking lot.

This Project is using SRF Loan Funds and Federal Funds and there are additional terms and conditions required to comply with the contract specifications. Please confirm all requirements are met and documents are included with your bid. This Project will comply with SRF and Federal requirements. In the event of a discrepancy between City of Fargo contracting requirements and SRF and Federal contracting requirements, the SRF and Federal contracting requirements shall prevail. BR-24-C1 of the following: South Woodcrest Drive North from Lilac Lane North to Willow Road North & North Woodcrest Drive North from Willow Road North to Lilac Lane North. Bids shall be on the basis of cash payment for work performed. Bidders are required to comply with Davis-Bacon prevailing wage requirements. All bidders should be advised that if awarded, the Contractor shall comply with the (i) American Iron and Steel requirements; (ii) Civil Rights requirements; (iii) Equal Employment Opportunity requirements; (iv) create an affirmative action plan; (v) provide evidence of compliance with the Disadvantaged Business Enterprises (DBE) participation; (vi) and provide evidence of compliance with the Davis Bacon Act as more fully set forth in the Contract. All of the foregoing is located in the City of Fargo, Cass County, North Dakota. Lots 16 through 30, Block 2, Inclusive. Lots 1 through 15, Block 3, Inclusive. All in the Van Raden's 2nd Addition. The existing water main on 1st Street is ACP, which was installed over 50 years ago, is being replaced to minimize impacts and costs associated with breaks. As part of this, we will replace the water main services to the curb stop and the sanitary services from the main to behind the curb. The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded it's life expectancy. Reconstruction will include asphalt street paving, gravel base, curb and gutter, storm sewer inlets and leads, driveway approaches, sidewalk, and streetlights. If you have any questions concerning the shut down, please contact one of the following: 1. Contractor at construction site 3. Engineering Department 241-1545 4. Mains and Hydrants 241-8174

Award

Water / Sewer

$1,340,526.00

Public - City

Outdoor Lighting, Paving, Site Work

41

6

21

12

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
119
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

December 25, 2023

img_map_placeholder

Multiple Locations, Fargo, ND

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.