Site work and paving for a mixed-use development in Topeka, Kansas. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

36C25523C0046 PRESOLICITATION SYNOPSIS: CONTRACT INFORMATION: a. This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. b. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms located within a 350-mile radius of the Colmery-O'Neil VA Medical Center in Topeka, Kansas. The mileage restriction is in compliance with VAAR 805.207(b). This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. c. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330's from qualified contractors that meet the professional requirements. d. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. The contract is anticipated to be awarded on March 06, 2023. e. Award of any resultant contract is contingent upon the availability of funds. f. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only (gislaine.dorvil@va.gov). g. Personal visits to discuss this announcement will not be allowed. h. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $12.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 194 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. i. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219-10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, (http://www.Vetbiz.gov), SHALL BE CONSIDERED. j. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into Presolicitation Notice the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. k. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. l. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) m. Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be bound in 3 ring binder) and a CD copy of the Standard Form 330. n. Completed package shall be delivered on or before January 20, 2023, by 2:00PM CST to the following address: Department of Veteran Affairs, NCO 15 Contracting Office, Attn: Contracting Officer: Gislaine Dorvil, Contracting Office Address: 3450 SW Trafficway. Leavenworth, Kansas, 66048. o. Outermost envelope or packaging shall clearly identify Solicitation number and project. Information shall be submitted via commercial courier service, mail or hand carried deliveries. Telegraphic, email, and facsimile forms are prohibited. PROJECT INFORMATION Description of work to be performed includes: Architect-Engineering services are required for Schematics Design, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, and all other related information for Project 586A5-23-188, AJP FCA - Repair Roads, Parking, and Sidewalks. The project will include design work for the preparation of 100% complete working drawings and contract documents using edited VA Master Specifications to complete the following: I. STATEMENT OF AE TASKS A. The AE shall furnish all services for a complete schematic design, design development, construction documents, bid documents, Technical Specifications, Cost Estimates, construction period services, Site Visits, As-Built Documentation, and all other related information as outlined in the "AE Instructions" for project 586A5-23-188, AJP FCA - Repair Roads, Parking, and Sidewalks at Topeka VA Medical Center. 1) Tasks Initial survey/conceptualization o Conduct initial survey of spaces, utilities, fixtures, layout, landscaping, architecture, seismic shell, walkways, and all other appurtenances associated with the main lobby or front entrance o Complete a geotechnical evaluation, if necessary, and review prior boring logs o Meet with Facility Planner, Leadership, and other applicable members of the facility Integrated Project Team (IPT) to solidify our needs, discuss layout, etc. o Survey for hazardous materials (lead, asbestos, etc.) Conceptualization o Create concept drawings and submit to the Contracting Officer's Representative (COR) No more than three distinct concept designs are requested o Create design posters and submit to the COR Utilize the facility Interior Design Scheme o Meet with IPT to discuss concepts, recommendations, and approve a particular concept Design Phase o Design all items contained within the scope of work, as needed, for a complete construction package Drawings Abatement drawings Specifications Abatement specifications Visualizations Final visualizations to display in Lobby Cost Estimates Note and estimate Bid Alternates that could be taken away from the project but not reduce the Scope of Work; incorporate Bid Alternates as an integral part of the project o Total amount of Bid Alternates required to meet minimum of 20% of base bid construction cost, per Minor Construction Handbook Include provisions for small, disabled, veteran-owned businesses, locality, rurality, etc. that have a considerable impact to the cost of construction Scope of Work for Construction Construction Submittal Sheet Per specifications, expected submittals requiring approval Design calculations for HVAC, structural, seismic, etc. o GSF limits, per the Project Tracking Report (PTR) application No more than 2,000 GSF, new No more than 1,258 GSF, renovated o Meet with the IPT, per the submittal schedule below, after design submittal to the COR Take meeting minutes Record actions and track to completion Disperse information as needed Take notes of decisions made, and require signatures of approval from the IPT o Submit a CD containing all information relating to the final design of the project to the COR Solicitation/Pre-Bid Phase o Provide information on the project as requested by the COR and the Contracting Officer (CO) o Attend pre-bid meeting to discuss concerns, answer questions, and be a stakeholder in the construction process o Work with the CO to issue amendments to the solicitation o Work with the CO to answer Requests For Information (RFIs) Construction Phase o Provide Construction Period Services Review submittals from the construction contractor Approve/deny submittals based on design specifications Respond to RFIs from the construction contractor or COR Coordinate with the COR to complete site visits or walkthroughs at milestones of construction Coordinate with the COR to complete a Punch-List Coordinate with the COR to complete a final walkthrough Provide industrial hygiene oversight for abatement of hazardous materials As-Built drawings, full-size mylars Update current plumbing, electrical, and space drawings with changes due to this work 2) The AE will be required to attend in person (or Senior Delegate of AE) to pre-bid meetings, a pre-construction meeting, project construction meetings and a final inspection meeting. There will also be various construction site meetings that will require a representative of the AE. 3) AE will provide meeting notes and or minutes for meetings and conference calls. 4) The A-E shall provide competent design and construction period services utilizing individuals who are adequately knowledgeable of the various design disciplines including but not limited to architectural and engineering of structural, mechanical, electrical, and special systems as required by the project. Changes in personnel from those who are proposed in negotiations, interviews, kick-off meeting, and/or A-E submission forms must be approved in writing. The registered individuals who will stamp the completed documents shall accomplish engineering design work. B. The AE shall provide cost estimation, project scheduling & phasing, bid period and construction period services as further described in the contract. Estimates shall have a full itemized line-item breakout commensurate with the degree of design accomplished. At the Schematic Design phase, square foot estimates would be adequate. As the design progresses in detail, so the estimate would progress in detail. C. The AE shall provide bid documents in both hard paper copies and electronic format. Electronic format shall include AutoCAD and Microsoft Word/Excel as well as PDF format for all. Final PDF of the construction drawings shall include the professional stamp. D. AE shall design construction to phase and coordinate work to minimize disruptions to medical center operations. Outages shall be minimized, and temporary conditions planned to maintain critical utility systems. Suitable space/access for mechanical room equipment maintenance must be maintained throughout construction. Must keep the number of outages to a minimum and group common work. Phasing of interruptions shall be clearly indicated on the construction documents. E. A-E shall design within funding limitations. AE shall coordinate cost control measures with COR to design within funding limits. Cost control alternatives shall be explored in Design Development (DD's). The AE is required by national VA Directive to include at least a minimum of 20% bid deductions. F. Review AE Quality Alerts from the TIL. Design completion timeframe of 194 days after receipt of the Notice to proceed. The A/E firm shall also be required to perform construction period services after award of the construction project contract. In accordance with FAR 36.204, the estimated magnitude of the resulting construction project is between $1,000,000.00 and $5,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Roads / Highways

$1,847,347.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
36
Bidding Soon
640
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.