BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Norco, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Contract Documents, Specifications and Plans for the above stated project. In general, the project consists of replacing the existing Shawnee Sewage Lift Station with a new Shawnee Sewage Lift Station (Station). In general, the work will include constructing a new submersible lift station with wet well, submersible pumps, above grade discharge piping, air entrainment system, connection sewer and force main, motor control center (MCC), potable water service, security fencing, and site improvements. The work will also include demolition of the existing packaged Station and associated electrical panels. There are 130 working days allowed to complete this project from Notice to Proceed. Please note that Notice to Proceed will be granted in accordance with Special Provision 6-1 with the understanding that Notice to Proceed will coincide with mobilization. Notice to Proceed will not be granted until the procurement schedule for major equipment has been established to the satisfaction of the City Engineer. Liquidated damages may be assessed at $1,000.00 per working day. All necessary forms, specifications and other bid documents may be viewed and downloaded electronically. Businesses who have registered in the Vendor Portal will receive email notices when a new request for bid or proposal relevant to their line of business is issued. Any interested party may view the City s solicitations, as well as the bid results and final notices of award, by logging into the Vendor Portal and using the search features to locate the items of interest. The City s policy is to award bids to the lowest responsive and responsible bidder. Requests for proposals are awarded to the company whose proposal provides the best overall value and best meets the needs of the City. The City reserves the right to reject any or all bids and to waive any irregularity or informality in any bid to the extent permitted by law. Specifications and Contract Documents are available in digital format (PDF) through the City of Norco's Vendor Portal on Planet Bids by clicking on the Bids and RFPs tab at the top of the City of Norco's website home page, then by clicking on the BID AND RFP OPPORTUNITIES icon. Contractor to strictly adhere to all State labor laws. Pursuant to Labor Code section 1771.1, all bidders are hereby notified that no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations. Furthermore, all bidders are hereby notified that no contractor or subcontractor may be awarded a contract for public works on a public works project unless registered with the Department of Industrial Relations. Pursuant to the provisions of Section 1770-1777 of the Labor Code of the State of California, Director of the Department of Industrial Relations has ascertained the general prevailing rate of wages and employer payments for health and welfare, vacations, pension and similar purposes in the City in which the work is to be done. Information relative to the employment of apprentices shall be obtained from the Director of the Department of Industrial Relations, who is the Administrative Officer of the California Apprenticeship Council. The Contractor shall forfeit, as penalty to the Agency fifty dollars ($50.00) for laborers, workmen, or mechanics employed for each calendar day or portion thereof, if such laborer, workman or mechanic is paid less than the general prevailing rate of wages herein referred to and stipulated for any work done under the proposed contract, by him, or by any subcontractor under him, in violation of the provisions of the Labor Code and, in particular, Sections 1770 to 1781 inclusive. Copies of all collective bargaining agreements relating to the work as set forth in the aforementioned Labor Code are on file and available for inspection in the office of the Department of Industrial Relations, Division of Labor Statistics and Research. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will be also required. Attention is directed to the provisions of Chapter 9, Division 3 of the Business and Professions Code requiring Contractors to be licensed. No proposal will be accepted from any Contractor unless they are licensed in accordance with the laws of this state. Contractor shall procure all permits incident to the lawful prosecution of the work. Further, the Labor Code of the State of California prohibits a Contractor from performing work on a public works project with a subcontractor who is ineligible pursuant to Section 1777.1 or 1777.7 of said code. The Contractor must possess a valid Contractor s License issued by the Contractor s State Board at the time the bid is submitted. The class of license shall be applicable to the work specified in the contract. The successful bidder shall be licensed according with the provisions of the Business and Professional Code and shall possess a Class A license at the time this contract is awarded. The successful Contractor and his/her subcontractors will be required to possess business licenses from the City of Norco. Construction shall be completed within 130 working days after the Notice to Proceed is issued. The bid prices shall include all costs, including labor, materials, and all other incidental cost to complete the project, in compliance with the Bid and Contract Documents and applicable standards. All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and applicable standards are assumed to be included in the bid prices. BIDDER understands that a bid is required for the entire work, that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The Contract Documents call for monthly progress payments based upon the City s estimate of the percentage of work completed. The AGENCY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful Bidder, the City of Norco will pay the amounts so retained upon compliance with the requirements of Government Code Section 4590 and the provisions of the Contract Documents pertaining to Substitution of Securities. Bidders shall be responsible for verifying the issuance of addendums before submitting a bid. Each bidder shall fully acquaint himself/herself with the conditions relative to construction, labor, plan, specifications, and special provisions. Submission of the proposal shall be taken as conclusive evidence of this familiarity with the job site and conditions relative thereto.

Bid Results

Water / Sewer

$1,372,300.00

Public - City

New Construction, Site Work

25

18

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
107
Bidding Soon
2,290
All Active Projects
904
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

January 30, 2023

img_map_placeholder

To Be Determined, Norco, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.