Renovation of an educational facility in Crozet, Virginia. Completed plans call for the renovation of a educational facility.
22030.02 Sealed bids are invited for the partial roof replacements at Western Albemarle High School. The project is generally described as removal of existing roof systems, and the installation of a fully adhered EPDM roof system over tapered insulation. Work includes all flashings and metalwork associated with single ply installations. Albemarle County School Board is soliciting sealed bids for removal of existing roof systems, and the installation of a fully adhered EPDM roof system over tapered insulation. Work includes all flashings and metalwork associated with single ply installations. All qualified bidders/offerors are invited to respond to this Invitation for Bids ("IFB") by submitting a bid/proposal consistent with the terms, conditions, and specifications stated herein. Additional details are included in the "Bid Receipt and Bid Opening Procedures". If the County of Albemarle is closed for business at the time scheduled for bid opening, for whatever reason, sealed bids will be accepted and opened on the next scheduled business day, at the originally scheduled time. The estimated construction cost range for this project is $1M - $3M. A Bid Bond is required for any bid which exceeds $100,000. The "Time for Completion" will be as detailed in the Bid Form. Bids to be considered shall be received in a sealed envelope marked as follows: County of Albemarle, Purchasing Office, Room 248, Albemarle County Office Building, 401 McIntire Road, Charlottesville, VA 22902 / Contract: Summer 2023 Roofing Projects -Western Albemarle High School Roof Replacement Phase Two / 2023-IFB1012092. Procedures for submitting a bid, claiming an error, withdrawal of bids, and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330A (i), Code of Virginia. The Owner reserves the right to reject any or all bids. The contract shall be awarded on a lump sum basis to the lowest responsive, responsible bidder whose Bid provides the lowest total project cost to the Owner. Contractor registration in accordance with Title 54.1, Chapter 11, of the Code of Virginia, is required. See the Instructions to Bidders for additional qualification requirements. Please note that Bidders are responsible to check the Purchasing web site and download any Addenda issued for this Bid. The County of Albemarle does not discriminate on the basis of race, religion, color, sex, national origin, age or disability, or against faith-based organizations as defined under the Virginia Public Procurement Act on the basis of such organization's religious or charitable character. The Invitation For Bids (IFB) consists of the Notice, this Instructions to Bidders, the Bid Form, the Pre-Bid Question Form, the Construction Contract General Conditions, the Supplemental General Conditions (if any), the Special Conditions (if any), the Forms to be used, and the Scope of Work as described by the Plans and Specifications, other documents listed in the Specifications, and any addenda which may be issued, all of which request qualified bidders to submit competitive prices or bids for providing the described work on the project. Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds one hundred thousand dollars ($100,000) shall be accompanied by a Bid Bond payable to the Owner as obligee in an amount equal to of the amount of the bid. A Bid Bond may be required for projects having bids of less than one hundred thousand dollars ($100,000) if such requirement is stated in the Notice of Invitation for Bids. The Bid Bond must be issued by a surety company which is legally authorized by the Virginia State Corporation Commission to do fidelity and surety business in the Commonwealth of Virginia. The bid bond shall identify the name and address of an attorney-in-fact who is appointed to act on behalf of the surety. The attorney-in-fact shall affix to the bond a certified and current copy of the power of attorney. Such Bid Bond shall guarantee that the bidder will not withdraw his bid during the period of sixty (60) days following the opening of bids; that if his bid is accepted, he will enter into a formal contract with the Owner in accordance with the Contract Between Owner and Contractor included as a part of the IFB Documents; that he will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond on the forms included in the IFB documents; and that in the event of the withdrawal of said bid within said period, or failure to enter into said contract and give said bonds within ten (10) days after he has received notice of acceptance of his bid, or other forfeiture under the Bid Bond, the bidder shall be liable to the Owner for the difference between the amount specified in said bid and such larger amount for which the Owner may contract with another party to perform the work covered by said bid, up to the amount of the bid guarantee. The Owner reserves the right to cancel the Invitation for Bids, to reject any and all bids at its sole discretion when such rejection is in the interest of the Owner, or to reject the bid of any bidder who is determined to be not responsive or not responsible. See 2.2-4319, Code of Virginia. The Contract, if awarded, will be awarded to the lowest responsive and responsible bidder, if any, provided his bid is reasonable and it is in the best interest of the Owner to accept it and subject to the Owner's right to reject any and all bids and to waive informality in the bids and in the bidding. The Bid Form may contain a multi-part Base Bid and may contain Additive Bid Items. Determination of the lowest responsible bidder, if any, will be based on the Total Base Bid amount entered on the Bid Form including any properly submitted bid modifications plus as many Additive Bid Items taken in sequence as the Owner in its discretion chooses to Award. Where the sum of the values entered in the multiple parts do not agree with the Total Base Bid amount, the Total Base Bid amount entered on the Bid Form, including any properly submitted bid modifications, shall take precedence. In the event that the Total Base Bid from the lowest responsible bidder exceeds available funds, the Owner may negotiate the Total Base Bid amount with the apparent low bidder to obtain a contract price within available funds, pursuant to 2.2- 4318 of the Code of Virginia and Section 12(c) herein. Bidders are responsible to check the Purchasing web site and download any Addenda issued for the bid. A deposit is not required for downloading of electronic documents through the web site. The bidder is responsible for the cost of printing any contract documents necessary for bidding. If awarded a contract, the Owner will provide the contractor with two sets of contract documents (i.e. full sized drawings and specifications) for use in the field and the contractor will be responsible for the cost of printing any additional contract documents that may be needed. The Contractor is responsible for the scheduling and sequencing of the Work, for coordinating the Work, for monitoring the progress of the Work, and for taking appropriate action to keep the Work on schedule. The Contractor may attempt to achieve Substantial Completion on or before the Time for Completion or the Contract Completion Date established by the Contract and receive payment in accordance with Section 36 for the Work completed each period. However, the date established by the Contract Documents as the deadline for achieving Substantial Completion must be used in all schedules as the date on which Substantial Completion will be achieved. The time (in days) between the Contractor's planned early completion and the contracted Time for Completion is part of the Project "Total Float" time and will be used as such. Extensions of time pursuant to Sections 38 and 42, damages for delay, and all other matters between the Owner and the Contractor will be determined using the contractually required Substantial Completion date, not an early Substantial Completion date planned by the Contractor. Within two (2) weeks after the Contractor signs the Contract Between Owner and Contractor, unless otherwise extended by the Owner at the time of the signing, the Contractor shall prepare and submit to the Owner, with a copy to the Architect/Engineer, a preliminary bar graph milestone schedule for accomplishing the Work based upon the Time for Completion stated in the Contract. The preliminary bar graph schedule shall be in sufficient detail to show the sequencing of the various trades for each floor level, wing or work area. The Owner will notify the Contractor of its acceptance of or objections to the preliminary schedule within seven (7) days of receipt by the Owner. A fully complete Project schedule for accomplishing the Work must be submitted and approved by the Owner prior to making application for the first payment. The Owner's failure to reject or its acceptance of any schedule, graph, chart, recovery schedule, updated schedule, plan of action, etc. shall not constitute a representation or warranty by the Owner, including but not limited to a representation or warranty that the schedule is feasible or practical nor shall any such acceptance or failure to reject relieve the Contractor from sole responsibility for completing the Work within the time allowed. No progress payments will be payable to the Contractor until after it has submitted a preliminary schedule which is acceptable to the Owner. Neither the second progress payment nor any subsequent payment shall be payable to the Contractor until it has submitted a fully complete Project schedule accepted by the Owner. Nor shall subsequent progress payments be payable to the Contractor unless and until he maintains the monthly bar graphs or status reports required by Section 19(e) herein or unless and until he provides any recovery schedule pursuant to Section 19(f) herein. Failure to provide a satisfactory preliminary or fully complete Project schedule within the time limits stated above shall be a breach of contract for which the Owner may terminate the Contract in the manner provided in Section 40 of these General Conditions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$3,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2022
June 13, 2023
5941 Rockfish Gap Turnpike, Crozet, VA
Related To This Project
Crozet, VA
Bid Date: Dec 09 2022
Crozet, VA
Bid Date: Jul 11 2019
Crozet, VA
Bid Date: Jan 31 2023
Crozet, VA
Bid Date: May 15 2023
Crozet, VA
--
Crozet, VA
Bid Date: Feb 25 2022
Crozet, VA
Bid Date: Mar 18 2022
Crozet, VA
Bid Date: Mar 30 2023
Crozet, VA
Bid Date: Oct 25 2022
Fredericksburg, VA
--
Fredericksburg, VA
Bid Date: May 19 2021
Fairfax, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.