EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 11, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Reno, Nevada. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 11/23/2022 at 4:00 PM PT questions about the bid process, please contact Christopher Benham ph(775) 335-1868 email cbenham@rtcwashoe.com Prospective Bidders must be Contractors presently licensed under the Nevada State Law for the type of work specified herein. Every Bid shall be accompanied by a Surety Company Bid Bond, or by a Certified or Cashier's Check made payable to the Regional Transportation Commission in the amount of not less than five percent (5%) of the Bid, said amount to be forfeited to the RTC should the Bidder to whom the Contract is awarded fail to enter into a Contract in accordance with the Bid and other Contract Documents within ten (10) calendar days after award. Prevailing wage rates for Washoe County shall be posted on the work site and paid to all classifications of labor as required by the laws of the State of Nevada. The work to be performed under this Contract shall be commenced by the successful Bidder after the executed Contract Documents have been submitted, and within five (5) calendar days of the commencement date set forth in the Notice to Proceed. The work, including any and all alternates and options, shall be completed within thirty-five (35) working days after the commencement date set forth in the Notice to Proceed. The right is reserved to reject any and all Bids or accept the Bid that is deemed by the RTC to be in the best interest of the RTC. The RTC reserves the right to accept or reject any or all alternates or options or any combination thereof. The RTC also reserves the right to waive any irregularities and/or informalities in the submitted Bid Forms. PE Engineer's Opinion of Probable Cost: $650,000 to $850,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. CLARIFICATION DEADLINE 11/23/2022 4:00 PM Project Scope Construct accessibility improvements to 15 RTC bus stops throughout Reno and Sparks, with the majority being on NDOT maintained roads. The major work items include: Removal and placement of concrete sidewalks, driveways and curb cut ramps, for the placement of concrete bus stop pads and ADA improvements for connectivity with the incidental application of other work such as landscape restoration, placement of retention curbs, permanent pavement markings, traffic signal pedestrian push buttons, traffic signs, railings, drainage inlets, and temporary traffic control.

Award

Sidewalks / Parking Lot

$1,021,000.00

Public - County

Paving, Site Work

27

9

4

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
254
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.