EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 29, 2022 at 7:00 PM

Updated January 25, 2024

Renovation of an educational facility in Durham, North Carolina. Completed plans call for the renovation of a educational facility.

179-2223-667-Ctrl_Watlington, 179-2223-667-CTRL_WATLINGTON-1 The scope of this project is to replace existing system controllers, sensors, enclosures, and field devices. Existing actuators, free stats, valves, and relays are intended to remain. Any found not functional during checkout are to be captured on a deficiency report and replaced as needed. Integrate new equipment into the existing control system, previously installed, as per accompanying as-builts. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a periodof sixty (60) days. Bid security required is 5% of the bid in cash, certified check, or Bid Bond. Performance and Payment Bonds for 100% of the contract amount will be required. Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities. Minority Business Participation: Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project. Iran Divestment Act: Bidders shall note that the submission of a bid constitutes the bidder's certification to the State Treasurer that, as of the date of bid, it is not listed on the Final Divestment List created and maintained by the North Carolina Department of State Treasurer (the "Treasurer's Office") pursuant to the Iran Divestment Act of 2015, Chapter 147-Article 6E of the General Statutes of North Carolina (the "Iran Divestment Act"). Davis-Bacon Act: The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. If needed we will travel to Lakewood Montessori to review existing conditions at that school. Preferred Brands Conference: Scheduled immediately following Pre-Bid. Inspection of all sites shall be scheduled immediately after the Preferred Brands Conference. The design team and owner will provide access to all four schools. Please come prepared to drive separately to each site. The project Designer or Designer's representative will be available to answer questions. Statement of Qualifications: Each proposal shall be accompanied by a statement of qualifications that demonstrates experience in at least five (5) projects of similar scope within the past three (3) years with references. Statement of ability to staff project. Each proposal shall be accompanied by a statement of ability to staff including current project load, current staff levels and individual staff to be committed to this project if awarded. Direct all inquiries concerning this RFP to: Durham Public Schools Attn: Tanita Nicholson All questions must be submitted via email no later than November 22nd, 2022, at 2pm Email: Dist.Purchasing@dpsnc.net

Post-Bid

Educational

$250,000.00

Public - County

Renovation

25

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Louvers and Vents
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
63
Bidding Soon
1,173
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.