BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A No The City of San Diego's Miramar and Alvarado water treatment plants store and utilize Environmental Protection Agency (EPA) and California Accidental Release Prevention Program (CalARP) regulated chemicals. These chemicals are elemental chlorine and ammonia hydroxide that are used as part of the water treatment process. Due to the storage quantity and concentration at the plants, the City is obligated to fulfill federal and/or state reporting requirements for both chemicals. Chlorine and Ammonia are disinfection chemicals that are highly regulated due to their toxicity, release endpoint distances, concentration and threshold quantities used or stored. Elemental chlorine used at the plants are Federal EPA and CalARP program level 3 covered processes. The aqueous ammonia used at the plants are CalARP program level 2 ("state only") covered processes. Offsite consequences are a possibility from an unintentional or accidental release. Authority is delegated to the County of San Diego Hazardous Materials Division as the Certified Unified Program Agency (CUPA) for oversight of these processes. Between the two plants, each housing the two regulated chemicals, Water Production Division produces 16 separate reports during a five-year reporting cycle. There are three report types: RMP/PSM or CALARP (Public and Technical Document), a RMP Compliance Audit (an audit of the RMP), and a Process Hazard Analysis (PHA) . The City has recently completed the cycle of all reporting activities and is requesting proposals to complete the next cycle. Consultant shall perform research to evaluate and/or confirm the appropriate regulatory report for each Miramar and Alvarado Water Treatment Plant's chlorine and ammonia systems to meet state and federal reporting requirements. Consultant shall develop a 5-year schedule designating the timeline for each report development. Then the Consultant shall prepare the required regulatory reports for each chemical system by the specified deadline. Site visits and workshops will be required when applicable. The City shall apply a maximum of an additional 12 points for Small Local Business Enterprise (SLBE) or Emerging Local Business Enterprise (ELBE) participation, to the proposer's subtotal maximum evaluation points. Additional points will be awarded as follows to achieve the proposer's final maximum evaluation points: *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

February 15, 2023

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.