Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Spring, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
PROJECT NO.: 22G19547 Estimated budget: Over $75,000. Proposed water plant, includes construction of water well, ground storage tanks, hydro tanks, control building, booster pumps, detention pond, storm sewer, water distribution lines and miscellaneous concrete. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. The work includes an Evangeline Aquifer water well, one ground storage tank, two hydropneumatic tanks, a natural gas generator, a building, site drainage, a concrete driveway and all controls and appurtenances for a fully automatic system. Piping is provided for future surface water tie-in to the ground storage tank. In the future surface water will be provided by the North Harris County Regional Water Authority.
Bid Results
Water / Sewer
$6,200,913.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2022
February 13, 2023
27306 1/2 Cypresswood Dr, Spring, TX
Related To This Project
Spring, TX
Bid Date: Dec 16 2022
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
Bid Date: Apr 21 2021
Spring, TX
Bid Date: Feb 17 2020
Spring, TX
Bid Date: Aug 27 2019
Spring, TX
--
Spring, TX
--
Spring, TX
--
Spring, TX
Bid Date: Jun 21 2024
Spring, TX
Bid Date: May 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.