BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Baltimore, Maryland. Contact the soliciting agency for additional information.

The Project will be designed with the context of the master plan in mind and reflect design objectives in coordination with existing, concurrent, and future development. Notwithstanding the above, the Project may evolve, and/or the base parameters may be modified to reflect updated or revised plans, all within in the sole discretion of Developer. Any such revisions shall be limited to reasonable parameters, and communicated to qualified Respondents to update pricing, schedule, or other relevant factors. The infrastructure design in the Project will provide for ranges of ability and accessibility that comply with the American with Disabilities Act (the "ADA"). In addition to ADA requirements, the Developer has selected the Brigance Brigade Foundation to lead an independent task force to ensure that accessibility design is achieved. Port Covington is planned to be inclusive and designed to enable accessibility for every visitor and resident This RFQ is not in any manner to be considered an order for or an offer to purchase any or all of the services or materials set forth herein. The Developer reserves the right to accept or reject any or all proposals at its discretion, to make awards in any way it deems to be in the Developer's best interest, to negotiate privately with one or more Respondents regarding a "best and final offer" or any other matter, and to add or delete any specified services or requirements before awarding a definitive contract. Award of a final contract will be based in part upon available funding, the development of final pricing options, and will ultimately be exercised at the sole discretion of Developer. All information and intellectual property developed during the creation of the Contract Drawings shall be the property of the Developer. All supplementary instructions to Respondents are to be in writing. The Developer will not be responsible for oral instructions from any source. A principal, duly authorized to make contracts, must execute the Proposal. The Respondent's legal name and address must be fully stated. All qualified Respondents will receive a response from the Developer.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
553
Active Projects
270
Bidding Soon
3,671
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2022

December 23, 2022

Project location map

Multiple Locations, Baltimore, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.