Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Morton, Illinois. Completed plans call for the construction of a 19,000-square-foot municipal facility; and for site work for a municipal facility.
Bids shall include labor, materials, tools, equipment, and services for completion of the entire Project under a single fixed-price General Contract, between the Owner and the General Contractor. All HVAC contractors submitting a bid under a Prime contractors bid submission, are hereby advised that they must submit a Qualification Statement for this project. This must be submitted on AIA Document A305, Contractors Qualification Statement or on a separate letterhead following the format of the AIA A305 along with the additional information as requested in Project Manual Document 001153. A list of the Qualified HVAC contractors will be issued to the plan holders via addenda by November 22nd, 2022. Every bid shall consist of two (2) fully completed copies of the Bid Form Documents and shall be accompanied by a bid guarantee consisting of bid bond, certified check or cashiers check made payable to the VILLAGE OF MORTON, in amount of five percent of total bid amount. Failure of bidder to submit an acceptable bid bond, certified check or cashier's check in amount to cover proposals bid upon is cause for rejection of his bid. Successful bidder will be required to provide Surety Performance Bond and separate Labor and Material Payment bond, each in amount equal to 100% of contract price, within 10 days after prescribed forms are presented for signature. Surety on bonds shall be a duly authorized company acceptable to Owner. No bid shall be withdrawn for 60 days after opening of bids without consent of Owner. The Owner reserves the right to waive any irregularities and to accept or reject any or all bids when in the opinion of the Owner, such action will service the best interest of the Owner. Bids submitted, from Firms whose name does not appear on the Log, shall not be opened. The Architect and the Owner will not respond to questions orally regarding the Project outside of the Pre-Bid Meeting. All requests for clarifications or interpretations outside of the Pre-Bid Meeting shall be made in writing and will be answered by Addendum when appropriate. It is anticipated the Village of Morton will award the Project at their regular December board meeting, on Monday, December 19th, 2022. All correspondence shall be directed to Keach Architectural Design, Inc.; 99 Commerce Drive; Morton, IL 61550; (309) 263-4545; (309) 263-5515 Fax; Attention: Wes Sutter, wsutter@keach.biz. Bids on all work of this contract shall be subject to the provisions of the Illinois Prevailing Wage Act (Illinois Revised Status, Chapter 48, Section 395S - 1-12).
Award
Municipal
$8,172,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2022
March 1, 2023
445 E Birchwood St, Morton, IL
Related To This Project
Morton, IL
Bid Date: Nov 30 2022
Morton, IL
Bid Date: Jan 20 2023
Morton, IL
Bid Date: Jan 20 2023
Morton, IL
Bid Date: Jan 20 2023
Morton, IL
Bid Date: Apr 13 2022
Morton, IL
Bid Date: Mar 17 2022
Morton, IL
Bid Date: Mar 29 2022
Morton, IL
Bid Date: Nov 10 2022
Morton, IL
Bid Date: Nov 08 2022
Morton, IL
Bid Date: Oct 04 2022
Morton, IL
Bid Date: Oct 12 2022
Rockford, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.