EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 17, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

Furnishing all labor, materials, and performing all work for Hutchens Force Main Reroute. Bids must be submitted on the standard forms included with the Contract Documents. The Bidder's Alabama State Contractor's License Number and discipline shall be on the envelope. Bid guarantee in the form of certified check, bid bond, or Irrevocable Letter of Credit acceptable to the Board will be required for at least 5% of the bid amount, not to exceed $10,000. The Board reserves the right to reject any and all bids and to waive any informality in bids received. All bids must be submitted on a numbered set of specifications obtained from Volkert, Inc. as described in the Instructions to Bidders. No specifications will be issued later than twenty-four (24) hours prior to the time indicated for receiving bids.

Bid Results

Water / Sewer

$425,535.00

Public - City

Site Work

14

5

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Compaction, Erosion and Sedimentation Controls
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
33
Bidding Soon
510
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2022

January 4, 2023

img_map_placeholder

Multiple Locations, Mobile, AL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hutchens Force Main Re-route

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.