BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Sioux Falls, South Dakota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

SIOUX FALLS, S.D. (KELO) — After years of planning, construction to complete Veterans Parkway will soon be starting. South Veterans Parkway, a six-lane highway spanning 8.7 miles from Interstate 29 to the intersection of 57th Street and Sycamore Avenue, will take up to five years to complete. An exact start date for construction hasn’t been given as winter weather conditions continue in Sioux Falls. Director of Public Works Mark Cotter said the first two miles of road construction will be bid in April. “Each two miles will take about two years to build,” Cotter said in a city video discussing construction. Road construction on the $210 million project will take place in four segments – Cliff Avenue to Western Avenue, Western Avenue to I-29, Sycamore Avenue to Cliff Avenue and 57th Street to Sycamore Avenue. “The section of new road between Western Avenue and Cliff Avenue will be constructed first and is anticipated to begin in spring 2023,” an update on the South Veterans Parkway website said. People can also sign up for emailed updates on the project’s website. South Veterans Parkway will intersect with Cliff Avenue just south of 77th Street, bridge over 85th Street, intersect with Minnesota Avenue near the 85th Street Walmart and intersect with Western Avenue near Harrisburg North Middle School. South Veterans Parkway project to start in 2023 A pedestrian underpass will be installed west of Minnesota Avenue. Most of South Veterans Parkway will be three lanes of traffic eastbound and westbound with a 32-foot raised median separating travel lanes with a shared use path along the south side and a grass boulevard separating the path from the roadway. The speed limit for Veterans Parkway will be 55 mph. Design is underway for the other three segments of construction for South Veterans Parkway. Currently, North Veterans Parkway is mostly complete from I-90 all the way to 57th Street. The stretch from Arrowhead Parkway north to Madison Street is not the full six-lane width like the rest of Veterans Parkway but that will be changed in 2024 and 2025. After construction is finished for the new intersection of Arrowhead Parkway and Six Mile Road, it will be part of the detour route for when Veterans Parkway and Arrowhead Parkway will be shut down. ________________________________________________________________________________________________________________________________________________________ South Veterans Parkway Construction; utility construction with the corridor, construct (23-26). State funds are contributions for construction administration. As of November 14, 2022, this project is included in the City of Sioux Falls FY 2023 - 2027 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$9,400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
17
Bidding Soon
228
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

Veterans Pkwy, Sioux Falls, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.