BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Tulsa, Oklahoma. Completed plans call for the renovation of a educational facility.

1. Review site maps (See Drawings A - K) and install bottle filling stations at locations shown. a. Bottle filling stations provided by Owner. b. Elkay Enhanced EZH2O Bottle Filling Station & Single ADA Cooler i. (See Specification A, attached) 2. All locations have existing plumbing and drain lines to accommodate new fountains. 3. Provide finish to bottle filling stations and caulk to make nice in appearance. 4. Provide proper escutcheon rings to cover plumbing at water stops and line penetrations. 5. Water shut offs for locations should be above ceiling.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
94
Bidding Soon
1,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2022

January 12, 2023

Project location map

Multiple Locations, Tulsa, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.