BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING in: E. Meinecke Ave. - N. Dousman St. to N. Gordon Pl. E. Park Pl. - 70' +/- W. of N. Newhall St. to 120' +/-E. of N. Bartlett Ave. N. Shepard Ave. - E. Newport Ave. to E. Edgewood Ave. E. Webster Pl. - N. Maryland Ave. to N. Prospect Ave. TIME FOR COMPLETION: All work shall be completed by July 28, 2023. All work shall be continuous and the total number of workdays shall be 45 days. A project working day is defined as any day the contractor is able to work a minimum of four hours towards the completion of the project. LIQUIDATED DAMAGES, PER DIEM: $1000 Bond Percentage 10.00% The SBE requirement for this project is 15% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion’s (OEI) website. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: 1 Laborer – Construction Craft (or equivalent). If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid.

Award

Water / Sewer

$562,884.00

Public - City

Site Work

7

14

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
59
Bidding Soon
1,064
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

January 16, 2023

img_map_placeholder

Multiple Locations, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.