Site work for a water / sewer project in Hastings, Nebraska. Completed plans call for site work for a water / sewer project.

Water Main Replacement on 4th Street, Cedar Ave. to 2nd Ave. New 8" water main with directional drill installation and water service tie overs and replacements. Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Maintenance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Maintenance Bond. General Questions or Requests - Renae Griess Engineering Admin Assistant Ph# 402-462-3665 Email: bidquestions@cityofhastings.org The Contractor shall provide all labor, equipment, materials, and appurtenances necessary to complete the work as described on the drawings. This contract is a multi-phase project, in which the first phase is still in progress. Contractor to identify all utility crossings along the proposed water main alignment. Contractor to provide a pipe installation plan profile which identifies all buried obstacles along with a bore plan and bore log. The intent of these contract documents, specifications, drawings, and appendix are to provide the Contractor a description of the proposed work. 3.102 Work Not Included Under These Specifications. The following items of work will be furnished by the Owner or other Contractors: 1. Owner will perform soil compaction testing.

Award

Water / Sewer

$475,710.00

Public - City

Site Work

10

6

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
13
Bidding Soon
141
All Active Projects
69
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

December 30, 2022

img_map_placeholder

W 4th St, Hastings, NE

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.