Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
WATER MAIN ALTERATION AND RELAYS, at the following locations: W. Thurston Ave. (WT410210630), N. 36th St. to N. 40th St. (28 working day); N. 35th St. (WT410210631), W. Silver Spring Dr. to W. Oriole Dr. (44 working days); N. 36th St. (WT410210632), W. Silver Spring Dr. to W. Florist Ave. (70 working days); W. Douglas Ave. (WT410210644), N. 35th St. to N. 40th St. (46 working days); N. 35th St. (WT410210645), W. Kaul Ave. to W. Douglas Ave. (22 working days); W. Kaul Ave. (WT410210646), N. 35th St. to W. Douglas Ave. (49 working days); N. 38th St. (WT410210647), W. Florist Ave. to 300' S/O W. Kaul Ave. (15 working days); N. 39th St. (WT410210648), W. Florist Ave. to 300' S/O W. Kaul Ave. (14 working days); N. Teutonia Ave. (WT410210649), W. Florist Ave. to 200' N/O W. Douglas Ave. (52 days); N. Teutonia Ave. (WT410210677), W. Sherman Ave. to W. Silver Spring Dr. (20 working days); W. Hampton Ave. (WT410220004), N. Teutonia Ave. to N. 60th St. (6 working days); W. Hampton Ave. (WT410220633), N. 32nd St. to 250' W/O N. 32nd St. (5 working days); N. 32nd St. (WT410220634) W. Hampton Ave. to 200' N/O W. Hampton Ave. (8 working days); N. 51st Blvd. (WT410220650), W. Congress St. to W. Hampton Ave. (68 working days) (Note: Contractor to furnish and install approximately 18,394 LIN. FT. OF 16", 12", 8", 6", 4", & 3" Ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.) Time for Completion: No work may take place between December 16, 2022 and March 13, 2023 unless otherwise approved by MWW Construction Engineer. Work on N. 35th St. (PF2022032, 2022033), W. Hampton Av. (PF2022052), W. Hampton Av. (PF2022053), and N. 32nd St. (PF2022054) shall begin immediately upon contract execution and shall be completed by May 12, 2023. All other work, including pavement restoration, shall be completed by December 15, 2023. Liquidated Damages, per diem: $649.00 The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder DAVIS BACON COMPLIANCE PROVISIONS: The City of Milwaukee has applied for funding for all projects in this contract through the Safe Drinking Water Loan Program (SDWLP) administered by the Wisconsin Department of Natural Resources. This contract is subject to the Davis Bacon Compliance Provisions. The contractor shall submit weekly payroll certification, utilizing the Payroll form included in the contract documents or equivalent.
Award
Water / Sewer
$4,245,010.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2022
December 30, 2022
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jan 12 2023
Milwaukee, WI
Bid Date: Nov 30 2021
Milwaukee, WI
Bid Date: Dec 09 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Nov 30 2022
Milwaukee, WI
Bid Date: Dec 09 2022
Milwaukee, WI
Bid Date: Nov 17 2022
Milwaukee, WI
Bid Date: Nov 17 2022
Milwaukee, WI
Bid Date: Aug 08 2022
Milwaukee, WI
Bid Date: Jan 27 2023
Milwaukee, WI
Bid Date: Dec 09 2022
Milwaukee, WI
Bid Date: Dec 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.