BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Farmington, Connecticut. Contact the soliciting agency for additional information.

The Scope of Work to be performed by the subcontractor, includes the furnishing of all labor, materials, equipment, tools, transportation, supervision, appurtenances, and services required to diligently perform all work in connection with the referenced project to the satisfaction of the architect, engineer consultants, construction manager and Owner, in accordance with the Contract Documents and as outlined in the Proposal Form. Pursuant to the terms and conditions of this Request for Qualifications /Proposals, (the RFQ/P) the Farmington High School Building Committee (the Owner), is seeking qualified respondents to submit qualifications and fee proposals for Materials Testing and Special Inspections Services for the new Farmington High School and Central Offices projects located at 10 Monteith Drive, Farmington, CT 06032 (the Project). After review of all qualifications, including fee proposals, the Farmington High School Building Committee reserves the right to reject any or all proposals, or any part thereof, or waive defects in same, or accept any proposal deemed to be in the best interest of the Town of Farmington and Farmington Public Schools. All questions or comments regarding this solicitation package shall be submitted to Assistant Town Manager via email at krajewskik@farmington-ct.org with the subject line: Materials Testing and Special Inspection Services. Questions must be submitted by Monday, November 21, 2022, at 2:00 p.m The method of contractor selection has not been determined at this time A new Farmington High School, located at 10 Monteith Drive, Farmington, CT will replace the existing structure. Construction will occur while the existing school is occupied and active. It is planned that the 900 Wing addition of the existing high school, constructed in 2003, will remain and be renovated into central offices. The new structure will be located on the same campus as the existing Farmington High School. The existing high school will remain in use during construction. Full demolition and abatement will occur following completion of all new construction. The new school will be 239,000 square feet and is projected to house 1,404 students by 2029 (grades 9 through 12). The Connecticut State Department of Education has approved total project funding in the amount of $135,540,000. The GMP for construction is estimated at $116,000,000. The project is commencing with Phase II of construction. An early enabling phase was completed in September 2022. Phase II construction is scheduled to break ground in November 2022 followed by a 30-month construction period. Anticipated Contract Award: Within one week The Owner reserves the right to waive technical defects in proposals, or to reject any or all proposals, in whole or in part; to negotiate with bidders and to make awards, in whole or in part, including accepting a proposal, although not the lowest proposal, that in its sole and absolute judgement, will be in the best interest of the Owner. All bidders will be notified of the decision in writing The Owner will not be held responsible for any costs incurred by the proposer for work performed in the preparation of a proposal or for any work performed prior to the issuance of a contract. All submitted proposals shall become the sole property of the Owner. The Owner reserves the right to accept or reject any proposal submitted for consideration if it is deemed to be in the Owners best interest to do so. The Owner reserves the right to correct inaccurate awards resulting from its clerical errors. The Owner reserves the right to reject the proposal of a respondent who is in default on any prior contract, or for misrepresentations. Each required insurance policy shall not be suspended, voided, cancelled, or reduced except after thirty (30) days prior written notice has been given to the Owner, ten (10) days for non-payment of premium. Identify key personnel in your company who will have a leadership/supervisory role in this project from start to finish. Include resumes, applicable licenses and NVLAP accreditations

Conceptual

Educational

$135,540,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
290
Bidding Soon
4,552
All Active Projects
1,937
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

img_map_placeholder

Multiple Locations, Farmington, CT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.