EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a educational facility; and educational facility.

**As of March 14, 2023, This project has not yet been awarded. A timeline for award has not yet been established.** The Scope of Work for the Plumbing and Fire Protection Construction Package shall include all necessary services, Work, labor, materials, supervision, tools, supplies, equipment, insurance, and applicable taxes necessary to complete Plumbing and Fire Protection Construction Package as shown in the Contract Documents for the above referenced Project. The Scope of Work for the Plumbing and Fire Protection Construction Package is further specified in the Agreement, the Scope of Work, the Plans and Specifications, and other documents that will be uploaded to TUebid as part of the solicitation. Temple University ("Temple") is seeking qualified contractors to bid on work for the Plumbing and Fire Protection Construction Package for the Samuel L. Paley Hall Renovations at Temple University, located at 1210 Polett Walk, Philadelphia, PA, 19122. The Samuel L. Paley Hall Renovation Project ("Project") will modernize Samuel L. Paley Hall as the new home for Temple's College of Public Health ("CPH"). The Project will locate CPH in the heart of Temple's main campus and bring new life to the former library building. The Project involves the partial demolition, complete renovation and re-purposing of the existing three-story building. The Scope of Work includes, without limitation, demolition of the facade, removal of the mechanical penthouse and roof structure, complete interior renovations, infrastructure upgrades, expansion of the building's footprint including a five-story addition, a fourth floor and partial fifth floor overbuild, and transformation of the building's facade. The total gross square footage of the building will be approximately 310,000 square feet. The Project is seeking LEEDv4 Silver certification and WELLv2 Silver certification. This Project is subject to a Delegation Agreement between Temple, the Pennsylvania Department of General Services and the Governor's Office of the Budget. This Project will be a multi-prime project delivered pursuant to a multi-prime contract delivery structure. The Prime Contractors will include: General Construction, Mechanical-HVAC, Electrical, Plumbing and Fire Protection, Low-Voltage-AV/IT/TelCo, Early Demolition, and each other contractor engaged directly by Temple to perform construction or supply machinery, materials, equipment or labor for construction of the Project and which are identified by Temple as being a Prime Contractor for the Project. *Addendum 1, 2, 3, 4, 5, 6 and 7 have been released. *1.) The owner has provided a Bid Extension. 2.) Attached is updated answers to RFIs as of 1/05/23. Please review and adjust your proposals accordingly. 3.) Please take notice to the previously sent attached bid form. We ask that you break out your proposal accordingly. a.) Provide Base Bid 1 and break out per schedule of vales b.) Provide Bond cost only for certain trade designated as critical work (See bid form). c.) Provide alternate price that affects your trade. d.) Provide break out cost for Mock Ups (that is included in your base bid). Check specifications if it's required for your specific trade. e.) Provide insurance cost that is excluded from Total Proposed Cost of Work as result of the OCIP program. 1104-0070, E2019037A The Scope of Work for the Plumbing and Fire Protection Construction Package shall include all necessary services, Work, labor, materials, supervision, tools, supplies, equipment, insurance, and applicable taxes necessary to complete Plumbing and Fire Protection Construction Package as shown in the Contract Documents for the above referenced Project. The Scope of Work for the Plumbing and Fire Protection Construction Package is further specified in the Agreement, the Scope of Work, the Plans and Specifications, and other documents that will be uploaded to TUebid as part of the solicitation *Addendum #8 has been uploaded for the project and you will need to access it accordingly. It includes the following documents: 1.) 93013 Ceramic Tiling (Revised Spec). 2.) 096519 Resilient Tile Flooring (Revised Spec). 3.) Exterior Section Details A422 (Revised Drawing Sheet). 4.) Exterior Section Details A423 (Revised Drawing Sheet). 5.) Exterior Plan Details A434 (Revised Drawing Sheet). 6.) Enlarged Ramp and Roof Stairs...(Revised Drawing Sheet). Bid Results Base Bid 1 A. T. Chadwick Company - $6597000 Base Bid 2 A. T. Chadwick Company - $6762856 Base Bid 3 A. T. Chadwick Company - $6784906 Base Bid 4 A. T. Chadwick Company - $6804004

Bid Results

Educational

$26,948,766.00

Public - State/Provincial

LEED Certification, Renovation

389

42

455

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Decorative Metal, Decorative Metal Stairs, Decorative Metal Railings, Glazed Decorative Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Decking, Sheathing, Underlayment, Gypsum Sheathing, Architectural Woodwork, Architectural Wood Casework, Wood Paneling, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Vapor Retarders, Roofing and Siding Panels, Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Coiling Doors and Grilles, Folding Doors and Grilles, Panel Doors, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Louvers, Fixed Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Wood Flooring, Resilient Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Banners
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Rugs and Mats, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
236
Bidding Soon
3,936
All Active Projects
1,929
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

March 1, 2023

img_map_placeholder

1210 Polett Walk, Philadelphia, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Temple University Samuel L. Paley Hall Renovations - Plumbing and Fire Protection Construction Package

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.