BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in South Holland, Illinois. Completed plans call for site work for a water / sewer project.

No Bid Shall Be Withdrawn After the Opening of the Proposals Without the Consent of the President and Board of Trustees for a Period of Ninety (90) Days After the Scheduled Time of Closing Bids. A Certified Check/bank Draft Drawn on a Solvent Bank, Cashier's Check or Bid Bond, Payable Without Condition to the Village of South Holland in an Amount Not Less Than Ten Percent (10%) of the Bid Shall Be Submitted With Each Proposal, as a Guarantee That, if the Proposal is Accepted, a Contract Will Be Entered Into and the Performance of the Contract is Properly Secured. A Performance Bond in a Sum Equal to One Hundred Percent (100%) of the Amount of the Bid, With Sureties to Be Approved by the President and Board of Trustees for the Faithful Performance of the Contract Must Be Furnished by the Successful Bidder. All Bids or Proposals Shall Contain an Offer to Furnish a Bond Upon Acceptance of Such Bid or Proposal. The Right is Reserved to Reject Any or All Proposals, to Waive Technicalities, to Postpone the Bid Opening, or to Advertise for New Proposals, if in the Judgment of the Board of Trustees Their Best Interests Will Be Promoted Thereby. The Contractor is Advised That No Work Can Begin on the Project Until the Village Obtains All Required Permits. The Contractor Will Be Required to Pay Not Less Than the Prevailing Wage Rates on This Project as Established by the Illinois Department of Labor. The Contractor Shall Also Comply With All Applicable Federal, State, and Local Regulations. Bidder Qualifications and Experience Will Also Be Included in the Basis for Determining the Lowest Responsible Bidder. Prequalification Will Be Required to Be Submitted to the Engineer by All Potential Bidders Prior to Receiving a Bid Package. If in the Opinion of the Engineer and the President and Board of Trustees, an Applicant Would Not Be Able to Serve the Best Interest of the Village of South Holland, a Proposal Will Not Be Issued to the Applicant.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
119
Bidding Soon
1,739
All Active Projects
801
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

December 29, 2022

img_map_placeholder

Multiple Locations, South Holland, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.