Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Orange City, Florida. Completed plans call for site work for a water / sewer project.
From qualified licensed Contractors for ITB B180-0-2022/DRS; Blue Spring Nutrient Reduction Septic to Sewer Project, Phase I and IA. This project is a Federally assisted construction project, requiring compliance with Davis-Bacon prevailing wages, weekly certified payroll and statements of compliance from the Contractor and all subcontractors throughout construction. All proposed iron and steel products for this project are required to comply of the Federal Water Pollution Contract Act; and shall comply with the American Iron and Steel (AIS) Requirement as detailed in the October 2017 revision of the FDEP Supplementary Conditions. The City of Orange City, Florida is accepting sealed bids to competitively select a qualified licensed GENERAL CONTRACTOR to provide construction services associated with ITB B180-0-2022/DRS as specified by the Technical Manual and Construction Plans associated with this project. This is a grant-funded project utilizing State Revolving Funds (SRF) obligated through a Florida Department of Environmental and subject to audit under all Federal, State and City requirements that apply. This Contract has been prepared to comply with the Septic to Sewer Conversion Program which consists of the proper abandonment of septic tanks (as per Chapter 64E-6.011), connection of sewer lateral and grey water lines to the City of Orange City (City) sewer systems, and construction of new sewer main, manholes, and lift stations as shown on the plans. The project includes repair to asphalt and concrete hardscapes as well as repairs associated with the new work. The Contractor shall provide all materials, equipment, labor, supervision, and all incidentals associated with the construction of the Blue Springs Nutrient Reduction Project, Phase I and II in Orange City. The project shall consist of, but is not limited to: Obtaining all required permits from the Orange City and Department of Health; Pump out existing septic tanks; Connect all the sewer cleanouts and grey water lines to the City lateral; Abandon existing tanks; Backfill and compact all disturbed areas; Construct new sewer main; Construct new sewer manholes; Construct new lift stations and all associated components; Seed and Mulch restorations; Removal and replacement of fencing; Removal and replacement of concrete and Removal and replacement of asphalt. The work may also include coordinating with overhead utilities (Power, communications, etc.) along the alignment included in the scope. M/WBE's are encouraged to participate in the bid process. All questions must be submitted in writing and directed to David Santiago, CPPB, NIGP-CPP, Purchasing and Contracts Administrator at dsantiago@orangecityfl.gov. Any Bidder who is in doubt as to the true meaning of any part of the Bidding Documents, or finds a discrepancy or omission therein, is hereby directed to contact David Santiago, NIGP-CPP, CPPB, Purchasing Manager, in writing at dsantiago@ourorangecity.com, at least fourteen (14) days prior to the bid opening date, for an interpretation or correction. T
Award
Water / Sewer
$3,949,852.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 29, 2022
May 8, 2023
W French Ave, Orange City, FL
Related To This Project
Orange City, FL
Bid Date: Dec 07 2022
Orange City, FL
Bid Date: Dec 01 2023
Orange City, FL
Bid Date: Dec 01 2022
Orange City, FL
Bid Date: Feb 03 2022
Orange City, FL
--
Orange City, FL
--
Orange City, FL
--
Orange City, FL
Bid Date: Jul 27 2022
Orange City, FL
Bid Date: Aug 12 2022
Orange City, FL
Bid Date: Nov 18 2022
Weston, FL
Bid Date: Feb 16 2023
Weston, FL
Bid Date: Mar 14 2023
Land O Lakes, FL
Bid Date: Dec 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.