BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and new construction of a medical facility in Sacramento, California. Completed plans call for the demolition of a medical facility; for the construction of a medical facility; and for site work for a medical facility.

Subject to conditions prescribed by the University of California, UC Davis Health, responses to Prequalification Questionnaires are sought from Proposers for the following project: Central Utility Plant Expansion. This prequalification is for a Progressive Design Build Team (Contractor/Architect Teams) as the University intends to use the Progressive Design Build delivery method for this Project. The Progressive Design Build contract will require the successful Proposer to enter into the contract and to provide both design and construction services. The University's primary objective in utilizing the Progressive Design Build approach is to bring the best available integrated design expertise and construction experiences to this Project. The University has determined that proposers on this project must be prequalified. Prequalified proposers will be required to have the following: (Contractor) California contractor's license(s): B - General Contractor; (Architect) California Architects License. UC Davis Health will accept prequalification questionaries from Progressive Design Build teams having completed three (3) comparable projects in the past fifteen (15) years containing the following comparable elements: Each project must be at least $50 million in 2022 construction value. Projects can be part of larger campus project but the Central Utility Plant portion shall be at least $50 million in 2022 construction value. Project can be an expansion of a Central Utility Plant but shall be on healthcare or highly technical facility of similar scope, cost, size and complexity. At least one project shall be on an active campus. At least two projects must be delivered as a Design-Build contract or similar (i.e., Integrated Form of Agreement, or GMP Construction contract having provided Preconstruction Services, or CM-at-Risk) completed in the last 15 years. The UC Davis Medical Center, located in Sacramento, has a 50-year history of providing high-quality patient care across the greater Sacramento region and the 33 counties it serves. UC Davis Medical Center's 142-acre campus is served by central heating and cooling plant ("Central Utility Plant") built in 1998 and is nearly at its utility capacity and requires an upgrade. Starting in 2019, UC Davis Health undertook a comprehensive utilities master planning effort to outline the infrastructure and facilities needed to address future healthcare, education, research, and teaching needs on the Sacramento Campus and in the greater Sacramento region. The Utility Master Planning Team identified a critical need for UC Davis Health to upgrade utility services and expand the infrastructure to support current and upcoming utility operations. The Central Utility Plant Utility Upgrade and Expansion will address the utility requirements for the new buildings at UC Davis Health's main campus. The expansion is currently a baseline program of 40,000 (GSF) new annex building, Health Care Access and Information (formerly Office of Statewide Health Planning and Development) Level-1 utility space, diesel generators, electrical rooms and as well as administrative support space to facilitate campus operations and 9,000 (GSF) renovations within the existing Central Utility Plant, including replacement of chillers. The CUP master plan and underground distribution is divided into three (3) phases, with the Central Utility Plant Expansion included in this project scope. • 48X Complex - Current project that consists of limited upgrades and extending utilities from the Central Plant to serve the 48X Complex only. Project is estimated to be completed by 2025. • Central Utility Plant Expansion – This project will expand the Central Plant capacity to support the California Tower and additional future projects. • Central Plant Modernization - Future project to expand the capabilities of the Central Plant by converting the Campus to an All Electric operating Central Plant. One project must be located in California and serve a HCAI 1 Facility. Prequalification documents will not be accepted after the due date and time. No supplemental data or additional project information will be accepted after due date and time unless specifically requested by the University. To prequalify, Design-Builders must agree to comply with all proposal conditions including state prevailing wages, bid bond, payment and performance bonds, insurance requirements, and attend in its entirety the mandatory prequalification conference. The five (5) most qualified teams will be invited to participate in the design-build solicitation process. Following the submittal of technical and cost proposals, a contract will be awarded to the team that offers the lowest cost per technical point. The University reserves the right to reject any or all responses to this notice, to waive non-material irregularities, and to deem Design-Builders prequalified to submit proposals for the project. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.

Award

Medical

$193,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
82
Bidding Soon
1,541
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

February 3, 2025

img_map_placeholder

2315 Stockton Blvd, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.