BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a financial development in Sharon, Pennsylvania. Completed plans call for the demolition of a financial development; and for site work for a financial development.

It is the intent of the Owner to enter into a single Demolition Contract for the work. Bids shall include a Bid Security Bond or Certified Check, payable to the City of Sharon, in an amount of ten percent (10%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. A. The Contractor shall provide all items, articles, materials, equipment, operations, or methods listed, mentioned, or scheduled on the Drawings and/or herein specified, including all labor and incidentals necessary and required to complete demolition work. The demolition work consists of, but is not necessarily limited to the following: 1. Protecting all trees, monuments, benchmarks and natural features of site areas designated to remain undamaged. 2. Protecting all existing building features and finishes designated to remain. 3. Certain existing materials may require removal and salvaging for re-installation. Refer to Paragraph 3.02.C for protection of materials. 4. Materials removed but not salvaged for reuse may remain the property of the Owner - the Owner reserves first right of refusal of all material, equipment, piping and/or fixtures. Contractor shall review all salvageable items with Owner prior to start of demolition work. Owner will instruct Contractor where selected items are to be delivered for storage on-site. All unselected items shall be disposed of by the Contractor off the site. 5. Removal of all materials as indicated on drawings. 6. Remove all rubbish, trash, junk, demolition/construction debris, etc., from the site. Do not bury or burn on site. The scope of work for this project covers the supplying of all labor, tools, materials, equipment, services and appurtenances to accomplish the work listed below. The work shall be performed to the complete satisfaction of the City of Sharon and their representatives, in accordance with the current EPA and OSHA regulations, AHERA regulations, Pennsylvania State Labor and Industry, and PA Department of Environmental Protection regulations and any other applicable State and Local Government regulations

Award

Financial

$697,000.00

Public - City

Demolition, Site Work

20

14

4

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
48
Bidding Soon
1,124
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

January 2, 2023

img_map_placeholder

1 E State St, Sharon, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.