EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 12, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Ontario, California. Completed plans call for site work for a water / sewer project.

**As of January 12, ,2023, this project has not yet been awarded. A timeline for award has not yet been established.** PN-20-184-1041 Scope of Services The work to be performed under this Contract generally consists of furnishing and installing Advanced Metering Infrastructure (AMI) technology at three locations within the City's water system. The construction will be in the following locations: o Site T3 - Well No. 49 - 1395 South Dupont Avenue o Site T4 - Well No. 24 - 700 North Haven Avenue o Site T5 - South Archibald Avenue and Ontario Ranch Road The work under this contract consists of the installation of the following equipment at each site: mast, remote telemetry unit, radio antenna, 110V power, uninterruptible power supply, electrical conduit, and communication cables; site preparation and site restoration as necessary, and other improvements as described in the Plans and Technical Specifications for OMUC Contract No. UT 1053. The Contractor will furnish all transportation, materials, tools, time, equipment, labor, and supplies to complete the improvements, together with the appurtenant work necessary or incidental to complete, in a workmanlike manner, the improvements as contemplated and as intended by the Plans and these Technical Specifications. The bidder must attach a pdf file to the electronic bid submission containing all of the completed and signed bid documents including a bid bond; all are labeled "bidder must include this form as pdf attachment to electronic bid" at the top of the pages. Bidder may begin bid process at any time prior to the bid deadline. Information entered is viewable only to bidder and may be saved, changed, or withdrawn up until the deadline. Award of bid will be predicated on the lowest bid amount (bid items 1 through 51). Q&A Deadline 12/06/2022 8:00 AM (PST) No substitution will be considered unless written request for approval has been received by the City Such requests shall include the name of the material or equipment for proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other materials, equipment or other portions of the work including changes in the work prompted by the substitution shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer. The City's decision of approval or disapproval of a proposed substitution shall be final. The bidder is solely responsible for "on time" submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp from the Bid Management System indicating that bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids Cash, cashiers or certified check may be submitted in lieu of a bid bond. A personal or company check will not be accepted. This is a State Prevailing Wage Project. List all subcontractors being paid in excess of 1/2 of 1% of the total bid amount. Absent a named sub for any portion of the work, Bidder agrees he is qualified and will perform that portion of the work Bidders may not bid as a prime and also submit a bid as a subcontractor. It is the bidder's responsibility to become familiar with the contract documents in their entirety. All forms in the bid booklet must be properly completed to be deemed responsive. Award of contract will be made by City Council. Liquidated Damages $1,700 per Calendar Days Project Duration 240 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bidders must submit all questions pertaining to this bid through the Citys Online Bid Management System, by selecting the "Q&A" tab. Questions sent directly to City Staff will not be addressed and you will be directed to submit your question(s) online. Quantities listed are annual estimates only and not indicative of a guaranteed level of usage. Any items not listed on this bid shall be purchased at equivalent category discount. Select Place e-bid to start entering bid information. All information entered is visible only to bidder. Data entered may be saved or submitted and revised or withdrawn up to the closing deadline. All items can be substituted with an or equals or compatible product. If bidding on or equals or compatible product(s) bidder(s) MUST provide specification sheets for all or equal or compatible as a pdf attachment in the Attachments tab. Final determination as to equivlency is the sole prerogative of the City. List of pre-bid meeting attendees will be available in the bid management system. Attendees must be registered as a vendor in order to be listed. Local Programs & Policies This is a State Prevailing Wage Project. Bidder must comply with SB854 - Public Works Contractor Registration Program.

Bid Results

Water / Sewer

$1,146,700.00

Public - City

Site Work

151

17

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Construction Aids, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Planting Preparation, Turf and Grasses, Seeding, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
133
Bidding Soon
2,416
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

February 14, 2023

img_map_placeholder

Multiple Locations, Ontario, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Automated Water Meter Reading With Advanced Metering Infrastructure (AMI) Technology (Phase 1)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.