BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Seattle, Washington. Completed plans call for the renovation of a municipal facility.

As of October 18, 2024, construction has begun. Seattle Public Utilities (SPU) is currently occupying space on ten full floors (44-50, 53, 59, 61) and three partial floors (17,27,40) in the Seattle Municipal Tower (SMT). They have decided to consolidate with a new space program and eliminate unused space as well as providing shared touchdown workstation spaces for employees working two or less days in SMT. As part of the project design SPU will also adhere to the City space standards for office and workstation sizes and will increase the quantity and type of meeting spaces as well as other amenities. The City of Seattle Department of Finance and Administrative Services (FAS), Capital Development Division (CD) is executing this tenant improvement project on behalf of its client SPU. Following the pandemic and space utilization impacts, a 25% Consolidation Pilot Program was prepared in March 2021 by SHKS Architects. Further, the City has developed furniture and finish standards including City of Seattle Space Design & Furniture Standards Reference Guide published May 10, 2021, SMT Tenant Improvement Manual, published January 2019 which will apply and be used for all four SPU floors. SMT is in the process of formalizing new lighting and control standards, updated tenant improvement requirements will be shared with the successful consultant. Programming for SPU, "SPU Seattle Municipal Tower Programming dated 10/18/2022," was recently completed by Allbee Romein (AR). Those materials are available with this solicitation. This RFQ intends to select the architect and engineer (A/E) team to provide professional design and construction administration services for four floors of this tenant improvement project (floors 47-50). A separate SPU tenant improvement project is underway with Allbee Romein for floor 53 at SMT, with the project scheduled to be complete by Q4 2023. The plans and specifications for floor 53 will be made available to the consultant team selected from this RFQ when complete, approximately January 31, 2023. The successful consultant will need to validate the current state of the program with SPU and make any necessary changes. SPU programming for the tenant improvement project that includes four floors (floors 47-50) totaling 77,387 usable square feet. The Maximum Allowable Construction Cost is $8.8 million. The project is funded by SPU. The deadline for questions is by 5:00 PM on December 14. Questions should be emailed to eileen.mchugh@seattle.gov. The method of Contractor Selection has not been Determined at this time. As of November 16, 2022, the due date and time has been confirmed with the owner.

Under Construction

Municipal

$8,800,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
30
Bidding Soon
896
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.