Renovation of a municipal facility in Kittanning, Pennsylvania. Completed plans call for the renovation of a municipal facility.

The prime contracts consist of the following: Contract MC-1 removal and replacement of a new boiler and related work and Contract PC-1 removal and replacement of a new water heater and related work at the Armstrong Court Apartment Building.Boiler & Water Heater Upgrades Project Notice is hereby given that this is a Section 3 covered project and that the area has been defined as a Section 3 area. The Housing Authority promotes the utilization of business concerns which are located in or owned in substantial part by persons residing in the Section 3 area and promotes job training and employment opportunities for qualified, lower income, Section 3 area residents. Any qualified Section 3 business may make written request to the HACA to obtain a list of all potential bidders in order to facilitate their ability to make their services known to these potential bidders.Compliance with Build America, Buy America (BABA) required as applicable. A certified check or bank draft, made payable to the order of "Housing Authority of the County of Armstrong", U.S. Government Bonds, or a satisfactory Bid Security (Bid Bond) executed by the Bidder and an acceptable surety, in the amount equal to ten percent (10%) of the total Bid, must accompany the Bid in accordance withthe Instruction To Bidders. No Bid Surety shall be waived or returned because the Bidder has failed or cannot comply with any requirements set forth in the plans, specifications or any applicable statutes of the Commonwealth of Pennsylvania or any applicable municipal ordinances. A Bid may not be modified, withdrawn or cancelled by the Bidder within sixty (60) calendar days following the time and date designated for the receipt of Bids, without the written consent of the Housing Authority. The surety must be a Guarantee or a Surety Company acceptable to the U.S. Government as published in the U.S. Treasury Circular No.576 and must be licensed to do business in the Commonwealth of Pennsylvania. The successful Bidder will be required to furnish and pay for an assurance of completion of project in the form of Payment and Performance Bonds, each in the amount of 100% of the Contract Price; a cash escrow in the amount of twenty percent (20%) of the Contract Price; or an irrevocable letter of credit in the amount of twenty-five percent (25%) of the Contract Price. Attention is called to all Bidders that all applicable Equal Employment Opportunity requirements for federallyassisted construction contracts must be complied with. This includes strict compliance with Executive Order 11246, as amended (establishing a goal of 6.9% for female employment and 5.0% minority percentage by craft); Nondiscrimination; Executive Order 11625, Minority Business Enterprise; Executive Order 12138, Women Business Enterprise; Section 3 of the Housing and Urban Development Act of 1968; Civil Rights Act of 1964; Minority Business Participation; and HUD Wage Rate Determination. The Work involves Mechanical (HVAC) Construction and Plumbing Construction improvements to the Armstrong Court Apartment Complex in Kittanning, PA owned and managed by the Housing Authority of the County of Armstrong. The complex includes an eight story apartment building, a Community Room and a Maintenance Shop area. It includes an asphalt surfaced driveway and parking area, concrete sidewalks and outdoor courtyard with gazebo Mechanical (HVAC) Construction Contract MC-1 -Base Bid Item # 1 Furnish and Install New Boiler Unit in Apartment Building as indicated on the drawings, including but not limited to: 1. Install HVAC piping and electrical components to support the installation ofthe new HVAC unit. 2. Disconnect and remove the existing furnace located in the mechanical room 3. Install new HVAC unit in the mechanical room. 4. Install the new exterior condensing unit. 5. Install new thermostat and control wiring. 6. Connect all HVAC piping, ductwork, flue connector and electrical components to the new HVAC unit. 7. Install new condensate line from AC coil to existing floor drain. 8. Verify new furnace and existing water heater are vented properly. 9. Clean up mechanical room and remove all debris from the HVAC unit installation. Plumbing Construction Contract PC-1 - Base Bid Item # 1 Furnish and Install New Boiler Unit in Apartment Building as indicated on the drawings, including but not limited to 1. Disconnect and remove existing water heater in the mechanical room. 2. Disconnect and remove the existing furnace located in the mechanical room 3. Install new HVAC unit in the mechanical room. 4. Install the new exterior condensing unit. 5. Install new thermostat and control wiring. 6. Connect all HVAC piping, ductwork, flue connector and electrical components to the new HVAC unit. 7. Install new condensate line from AC coil to existing floor drain. 8. Reinstall the existing water heater in the mechanical room. 9. Verify new furnace and existing water heater are vented properly. 10. Clean up mechanical room and remove all debris from the HVAC unit installation

Award

Municipal

$165,426.00

Public - County

Renovation

15

16

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
112
Bidding Soon
898
All Active Projects
408
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 5, 2023

img_map_placeholder

100 N Grant Ave, Kittanning, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Armstrong Court Boiler and Water Heater Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.