BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lake Mills, Iowa. Completed plans call for the renovation of a educational facility.

Custom BT MECHANICA - Harty Mechanical, Inc - $967,000.0 ELECTRICAL - Groe Electric, Inc - $141,250 GENERAL TRADES - Larson Contracting Central, LLC - $37,964. ACOUSTICAL TILE CEILINGS - Skaar Drywall & Acoustics - $76,500. The proposed project consists of the existing Media Center, Band Room, Vocal Music Room, and industrial Arts Room are to be renovated for new HVAC and lighting systems and new acoustic lay-in tile ceiling. The building will only be available for inspection during the pre-bid meeting and also by appointment with the school. All bids shall be on the forms provided in the specifications for project. The provided forms of proposal shall be submitted at the time required for bids. Progress Payments: Payment to the Contractor will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such payments will in no way be construed as an act of acceptance for any of the work partially or totally completed. Final Payment: Final payment to Contractor will be made no earlier than forty-five (45) days from and after final acceptance of work by the Owner, subject to the contract conditions and in accordance with the provisions of Iowa Code chapters 26 and 573. The Owner hereby reserves the right to reject any or all bids and to waive informalities and irregularities and to accept the lowest responsive and responsible bid. The work under the contract shall commence on or before the date specified in the written 'Notice of Proceed' or if lieu of the notice to proceed, the execution of the contract for construction and shall be Substantially Completed on or before August 4th, 2023, and fully completed and ready for acceptance no later than August 18th, 2023. The proposed project consists of the existing Media Center, Band Room, Vocal Music Room, and industrial Arts Room to be renovated for new HVAC and lighting systems and new acoustic layin tile ceiling. Low Bids: Mechanical Low: Harty Mechanical $967,000 2nd: Bill Young Plumbing & Heating $998,762 Electrical Low: Groe Electric $141,250 2nd: Schammel Electric $195,000 General Trades Low: Larson Contracting $37,964 2nd: Kingland Construction $70,000 Acoustical Tile Ceilings Low: Skaar Drywall $76,500

Bid Results

Educational

$1,222,714.00

Public - City

Renovation

27

11

2

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
22
Bidding Soon
261
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

April 10, 2023

img_map_placeholder

102 S 4th Ave E, Lake Mills, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.