BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Jackson, Michigan. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Jackson is currently inviting qualitied consulting firms to submit proposals for engineering services required for the construction of Lansing Avenue with traffic signals within the City of Jackson. The work for this professional services contract will be divided into tasks as follows: Task 1) Traffic Signal Modernization at four intersections of Ganson Street at Jackson Street, Lansing Avenue at North Street, Lansing Avenue at Clinton Road and Hill Street, and Lansing Avenue at Monroe Street. Also upgrade existing box span at Lansing Avenue and Ganson Street with reflectorized backplates. Signal installations will include backplates, vehicular detection, and pedestrian countdown signals. Task 2) Intersection enhancements on Blackstone Street: Blackstone Street and Lansing Avenue shall be realigned to connect the north leg of Blackstone into Lansing Avenue at a 90 degree. Blackstone Street and Louis Glick Highway shall be realigned to have the north leg of Blackstone with a three lane cross-section to provide a south bound center left turn lane. Task 3) On Lansing Avenue between Steward Street and Clinton Road: the project will implement a 4-3 road diet, The intersection of Lansing Avenue at Clinton Road will be realigned to connect with Hill Street, The roadway will be completely reconstructed with a new hot mix asphalt, new curbs and sidewalk repairs where needed. Water main on Lansing Avenue within the project limits has been replaced with 8 inch ductile iron in 1993. Clinton Road water main is 6 inch cast iron from 1926. Steward Avenue water main is 6 inch cast iron from 1919. Sanitary sewer on Lansing Avenue south of North Street is 12 inch PVC from 1993. Part of the 18 inch sanitary sewer on Lansing Avenue on the south side of Hill Street was lined in 1993. The remaining sanitary sewer pipe in the project limits is from 1907 and 1911 and were constructed as combined sewers. The storm sewers in the project limits was built in the late 1970s as part of the facilities plan to eliminate the combined sewers and have separated sanitary and storm systems. Questions are submitted online No The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$470,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
82
Bidding Soon
1,511
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

img_map_placeholder

Multiple Locations, Jackson, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.