BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Repair Infrastructure Along Wharf 18 Dredge Pipe at Turning Basin Terminal This project consists of installation of 110 LF of 36 in steel casing by trenchless crossing and the repair of an intrusion in a 30 in steel casing by open-cut at Turning Basin Terminal. The project will involve working in rights-of-way owned by third party, PTRA. A bid bond of 5% must be submitted with the response All technical questions and requests for clarification pertaining to the Proposal Documents shall be submitted, at least seven (7) calendar days before the Response is due, using the Port Authority's BuySpeed eProcurement System. For general questions regarding business with Port of Houston Authority: Procurement Services: 713-670-2461

Post-Bid

Water / Sewer

$1,600,000.00

Public - City

Site Work

10

16

6

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
61
Bidding Soon
3,713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.