BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a civil project in Miami, Florida. Completed plans call for the renovation of a water / sewer project.

The work consists of furnishing all materials, labor, and equipment necessary for electrical improvements that consist of replacing the existing 112.5KVA & 225KVA Transformers, proposed medium voltage cast-in-place concrete manholes (4000 psi)(10'x10'x7'), installation of concrete ductbank for wellhouses #1 through #10 feeders, and wires; which is owned and operated by the Miami-Dade Water and Sewer Department (OWNER), and located at 6800 SW 87th Avenue, Miami, FL 33173.Existing System Description:Wellhouse Facilities (1 thru 10) Currently Alexander Orr Water Treatment Plant have Ten (10) Wellhouses to pump Water. Wellhouses #1, #8, #9, #10 currently have 225KVA Transformers and Wellhouses #2, #3, #4, #5, #6, #7 currently have 112.5KVA Transformers with Obsolete Primary Switches. Wellhouses#1 thru #7 are currently fed from Transformers T6 and T10 Load Break Switch thru existing Ductbank. Wellhouses #8 thru #10 are currently fed from Transformer T14. A Kirk Key Interlock switch (At Wellhouse#7) serves as a safety interlock to ensure Wellhouse Transformers will not energized with both feeders at the same time.Installing of Owner Furnished Equipment (OFE) Primary Switches For all 10 Wellhouses. SBE-Con. Requirements:9.98% ,SBE-G Requirements : 1.60% Performance & Payment Bond Required: yes Bid Bond Required: yes. In the event a firm is established by executives, supervisors and other senior field staff (key employees) that would have met these minimum experience requirements with a prior firm, owner reserves the right to qualify the firm based on owner sole determination and evaluation of the knowledge and prior experience of these key employees employed by the new firm. The experience of key senior personnel with other firms may be counted towards the experience requirement, if acceptable to the engineer. Should such evidence not be satisfactory to the engineer, whose decision shall be final, the bid will be considered non-responsive, and the second lowest bidder will be considered for award. The qualifying proof shall be submitted in a separate sealed e nvelope with the bid.

Post-Bid

Water / Sewer

$3,500,583.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
47
Bidding Soon
1,085
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.