BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Miami Beach, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 8, 2023, this project has not yet been awarded. The project is expected to be awarded on March 27, 2023. 77th Street Bridge over Tatum Waterway is located between Hawthorne Avenue and Tatum Waterway Drive within the Biscayne Point neighborhood. According to the recent Florida Department of Transportation (FDOT) Bridge Inspection Reports from 2014 to 2022, this bridge has consistently received a sufficiency rating between 61.9 & 62.5. Since the rating is below the FDOT recommended minimum threshold of 70, improvements are proposed to bring the bridge into compliance. This Project will include enhancements to the bridge's substructure and superstructure. Elements of the bridge affected by the repairs are identified in the plans and specifications. Construction tasks for the Project include but are not limited to rebar replacement, pile jacket installation, and concrete repair (cracks, spalls, and delamination). Regulatory agencies' permits and exemptions acquired: Miami-Dade County DRER: Class I Construction Permit; U.S. Army Corps of Engineers: No permit required correspondence; CMB Building Department: No permit required letter; FDEP: ERP Exemption Letter; and SFWMD: ERP Exemption Letter. Approvals to be obtained by Contractor: U.S. Coast Guard: Construction Navigation Clearance, and Miami-Dade County DRER: Class I Construction Permit - Notice of Commencement of Construction. Q & A deadline: Dec 06, 2022 5:00:00 PM EST Contract duration: 180 days

Bid Results

Bridges / Tunnels

$597,460.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
113
Bidding Soon
1,730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

February 6, 2023

Project location map

77th St, Miami Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.