BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Burlington, Iowa. Completed plans call for the renovation of a educational facility.

The general nature of the work is as follows: Replacement of the air-cooled chiller in the high school Bidding documents may be examined at the Architect/Engineers office and at: Mediapolis Community School District, 725 North Northfield, Mediapolis, Iowa, DB Reprographics, 1209 Highland Court, Suite B, Iowa City, Iowa 52240 Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidders security shall be in an amount equivalent to five percent (5%) percent of the bid amount, and shall be in the form of a cashiers or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. Contractors using materials, supplies, and equipment on projects in designated exempt entities may purchase these items without liability for the sales tax. The contractor must have a purchasing agent authorization letter and an exemption certificate from the public entity to present to the retailer, which specifies the construction project and will be available for that project only. Mediapolis Community School District will issue an authorization letter and an exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. DO NOT INCLUDE SALES TAX ON YOUR BID FORM. No bid may be withdrawn for a period of 30 calendar days after the date of the scheduled closing time for the receipt of bids. The District seeks to provide opportunities for Targeted Small Businesses in the awarding of contracts and is authorized to award contracts to Targeted Small Businesses per the Iowa Acts of the 73rd General Assembly, 1989 Regular Session, Senate File 2274. For further information about the Targeted Small Business policies, contact the manager of Buildings and Grounds. This project has a target for Targeted Small Business participation of ten percent (10%). Bidders shall be prepared to submit a performance and payment bond conditioned on the faithful performance of the contract. Out-of-state bidders shall be prepared to submit an Out-of-State Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa labor to the extent lawfully required under Iowa law. Iowa law provides that on public improvements a resident bidder shall be allowed preference as against a nonresident bidder from a state or foreign country which gives or requires a preference to bidders from that state or foreign country. The preference so allowed shall be equivalent to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids. Completion Date: January 31, 2024

Post-Bid

Educational

$300,000.00

Public - County

Renovation

8

9

7

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
45
Bidding Soon
411
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

November 1, 2023

img_map_placeholder

725 N Northfield St, Burlington, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.