Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects. It gives contractors access to these skilled workers. Project Location: Pioneer Square. Bounded by Yesler Way on the north, S. King St. on the south, Alaskan Way on the west and 2nd Ave. S. on the east. The project goals of Pioneer Square East-West Streets Pedestrian Improvements are to construct roadway and pedestrian improvements on portions of Main, Washington, King and Yesler Streets between 2nd Avenue and Alaskan Way in Downtown Seattle. The work includes widening the existing sidewalk and repaving portions of the sidewalk and roadway along with irrigation, landscape and site furnishings for the pedestrians. In addition, vehicular traffic flow through the project will be revised to create more space for pedestrian access and improve the pedestrian realm. Other elements of the work include curb ramps, structural supports for curb ramps at areaways, storm drainage, sanitary sewer, and water improvements as well as signage and channelization. Additive: This work includes all equipment, labor, and materials required to remove existing improvements at the intersection of S. Main Street and Alaskan Way and install new paving, plantings, and irrigation as shown on the Drawings A/E Estimate Base Bid: $8,350,000 to $9,750,000. A/E Estimate Additive 1: $60,000 to $80,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 19 Percent WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Back-up contact is Carmen Kucinski. at carmen. kucinski@seattle.gov or 206-684- 0188. Questions must be emailed by 5:00pm, 3 Business Days before Bid opening. All questions must be e-mailed and be directed to the following: Before Bid Opening: David Vijarro, PE Seattle Department of Transportation David.Vijarro@seattle.gov After Bid Opening and Before Execution: Purchasing and Contracting FAS_PW_Admin@seattle.gov 206-684-0444 After Execution: Jessica Murphy Seattle Department of Transportation Construction Program Manager Jessica.Murphy@Seattle.Gov 206-684-0178 Inclusion Plan: All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188.
Bid Results
Roads / Highways
$13,751,577.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2023
July 17, 2023
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Feb 24 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Dec 14 2022
Seattle, WA
Bid Date: Dec 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.