BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Wentzville, Missouri. Completed plans call for the renovation of a educational facility.

As of January 25, 2023, project was awarded to Tech Electronics, Inc, awarded amount is $113,328.25. Security Camera NVRs and Installation Scope of Work This project scope of work will include the purchase and configuration of the existing security cameras into the school's Video Insight Server, including transferring the names of the cameras and removal of the existing NVR (leave in MDF at building). Video Recorder: Panasonic Video Insight (VI) server ("As Equal" does not apply to the VI server specifications): 1. This project will include the purchase of the Panasonic Video Insight (VI) servers (NVR-RL-1-24TB-V3 and NVR-RL-1-36TB-V3), support for all channels/cameras in the school, and the installation and configuration of the VI server, including transferring the names of the cameras and removal of the existing NVR (leave in MDF at building). Scope of Work Installation and Labor: 2. Delivery and installation of all materials outlined in Scope of Work. 3. Vendor will coordinate the delivery of all the equipment in scope of work and items needed for installation to be shipped directly to the installation team. Installers will in turn bring these items to the installation location at time of installation. 4. Coordinate with the District to prevent network and/or electrical outage(s). In the event such an outage is necessary, sufficient advance written notice will be given to the District, with such notice to include a plan and timetable. Remain in frequent, on-site contact with the work site to insure completion within the established timetable, in the event the District approves such an outage. 5. Coordinate installation schedule with Greg Lawrence, Director of Technology who will coordinate with the school staff. 6. Perform all work during school hours, between 7:00 am and 5:00 pm. 7. Standard Panasonic warranty (Limited Warranty for Video Surveillance Products) shall be followed, as described on Panasonic's website (link below). If the warranty is different, the vendor must list changes in Deviations

Award

Educational

$113,328.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
58
Bidding Soon
903
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

February 24, 2023

img_map_placeholder

To Be Determined, Wentzville, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.